Forum quick links
EQc4 - IAQ Assessment, Option 1. Flush-Out, Path 1. Before Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Theresa Lehman on
If the humidity exceeds the range (higher than 60%) for a couple of hours, can the team simply add those few hours onto the flush-out, or does the flush-out have to start completely over at the tim
Green area reserved for future building development
NC-v4.1 SSc2:Protect or Restore Habitatposted by Michael on
My project has 2 phases of development. Currently, we only apply LEED for phase 1. There is a big greenery area, reserved for future building in phase 2.
Interior Project Water Performance
EBOM-v4.1 WEc1:Water Performanceposted by yingling guan on
For interior project, if there is only one pantry faucet within the project scope. And occupants of this project will use other indoor water fixtures or fittings installed out of the thi
How to scrutiny the local testing agency's report for LEED Low emitting materials?
Retail-CI-v4.1 EQc2:Low Emitting Materialsposted by Sagar Siripuram on
Hello, I've been having this doubt for many days, Just wanted clarity on this query.
Nonroof measures for roof terrace
NC-v4.1 SSc5:Heat Island Reductionposted by Reshadee Weerasooriya on
Hi all,
Compliant EPR Programs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Tullos on
Has anyone had luck getting credit for a take back service program like Steelcase's (https://www.steelcase.com/services/#recycle
building on campus with no smoking policy
CI-v4 EQp2:Environmental tobacco smoke controlposted by Megan Valentine on
We are renovating a building on a campus. The campus has a no smoking policy with signage stating the policy at all entrances to the campus.
Campus approach: can we install water meter for the entire landscape, sanitaryware as a whole
NC-v4 WEc4:Water meteringposted by Michael on
My project is a campus project, consisting of 4 individual buildings. To fulfill this credit, can I install 1 meter to monitor sanitaryware for 4 buildings together as a whole?
PV Solar Panels outside LEED Boundary
NC-2009 EAc2:On-Site Renewable Energyposted by Ammar Yahia on
A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost.
BPDO Material Ingredients: required to report material cost if pursuing Option 1?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Adam Weiss on
Hello, if we are pursuing option 1 for MRc5 (20 compliant products from at least 5 manufacturers), are we required to report the cost of each material?