Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

TSS removal efficiency % table?

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Kash Boodjeh  on 

What is the best resource for finding TSS removal efficiency for various BMPs? Is there a table or reference to base our #s off of since we don't have calculations or on-site monitoring?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Sat Mar 3, 2012, 2:17 pm

Core & Shell M&V

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Randy Cook  on 

Hello, I have read thru the previous posts and responses, and hope this is not a redundant question. I am working on a C&S major renovation. We are going to follow Option B from IPMVP Vol.3.

3
Default Avatar
Associate Director
The Rock Brook Consulting Group
LEEDuser Basic Member
6 thumbs up
Fri Mar 2, 2012, 10:13 pm

Design or Construction Credit?

Pilot-Credits EQpc24:Acoustics
posted by  Orlin Velinov, PE  on 

Is this s design or construction credit? From the credit form requirements looks like the NC levels will have to be measured, the rest criteria can be theoretically analysed or modeled.

3
Fri Mar 2, 2012, 7:45 pm

Parking Capacity overflow to Gravel Lot

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Eduardo Guzman  on 

We have a research building that shares an asphalt parking lot with a warehouse (used by the researchers but not being certified).

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Mar 2, 2012, 5:46 pm

Specifications for GC regarding MR Credits

NC-2009 MRc2:Construction Waste Management
posted by  Jim Pugh  on 

We are about to start our 2nd LEED project and are interested in providing wording within the Specifications for the General Contractors bidding the project preparing them for the required paperwor

3
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Mar 2, 2012, 5:37 pm

Speech privacy

Pilot-Credits EQpc24:Acoustics
posted by  James Chueh  on 

Hi all, We have a clinic project that is seeking LEED HC certification and the credit IEQ c2 is similar to this pilot credit.

2
Default Avatar
Engineer
HFP Acoustical Consultants, Inc.
LEEDuser Basic Member
11 thumbs up
Fri Mar 2, 2012, 4:42 pm

Filter Performance

EBOM-2009 IEQc1.4:IAQ Best Management Practices—Reduce Particulates in Air Distribution
posted by  Alexa Stone  on 

Has anyone ever had an issue with MERV 13 filters not maintaining original quality and performance levels? Also, I cant find if this credit requires active monitoring of any sort that would capture

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Fri Mar 2, 2012, 4:32 pm

Cove lighting as decorative?

NC-2009 EAp2:Minimum Energy Performance
posted by  Orlin Velinov, PE  on 

Has anybody used the ASHRAE 9.6.2 Additional Interior Lighting Power allowance for cove lighting.

3
Fri Mar 2, 2012, 1:21 pm

Project eligible for Energy Star but outside US

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Tobias Wolf  on 

Dear Experts, does anybody know, if I can use the "Case 1" of EAp2 (using Portfolio Manager) or not?

8
Fri Mar 2, 2012, 6:41 am

ASHRAE 55 requirement in EAc1.3

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Juliana Malho  on 

Does anyone knows if ASHRAE 55 is really a requirement for the credit?

4
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Mar 2, 2012, 1:42 am