Forum quick links
Using ASHRAE Addenda
CI-2009 EAp2:Minimum Energy Performanceposted by Luis Miguel Diazgranados on
Hi everybody; The reference guide states "Project teams wishing to use ASHRAE approved addenda for the purposes of this credit may do so at their discretion.
Template issues for Option 1
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by renee jimenez on
Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f
Alternative Commuting
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Aron Weis on
Does the fact that 80% of the people in the building I am evaluating for LEED-EB have FlexFuel cars help? Even if they do not use FlexFuel (Ethanol 85)?
Sample of Measurement and Verification report for Option B?
NC-2009 EAc5:Measurement and Verificationposted by Eric JS on
Dear all, Do you have any sample of Measurement and Verifiation report for Option B? Thank you and cheers!
Core Performance Guide Requirements for Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Erik Dyrr on
To earn 5 points using Option 1: Equipment Efficiency, systems must comply with the efficiency requirements outlined in the Core Performance Guide.
Energy simulation
CI-2009 EAp2:Minimum Energy Performanceposted by Pongthon Junnapat on
For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work Thanks in advance
Exemplary Performance, Option 2, Path 4 (Non-Roof)
CI-2009 SSc1:Site Selectionposted by Curt Pascoe on
This is a follow up to other exemplary performance (EP) discussions that have occurred. I understand that an EP point can be earned under Path 12 of this credit.
Corridors in Dwelling Units
NC-2009 IEQp1:Minimum IAQ Performanceposted by Omer Moltay on
Dear All, In a residential building with natural ventilation only, should corridors and entry halls in dwelling units be shown to be provided with outdoor air (meaning complying with requirements
Basic services within the same shopping center
CI-2009 SSc2:Development Density and Community Connectivityposted by Alison Y Rivenburgh on
The LEED CI 2009 reference guide states that the project building itself cannot be considered 1 of the 10 basic services; however in a mixed-use building, a maximum of 1 service wtihin the building
Mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sam Keehn on
We are working on a Mosque in Qatar. All visitors to the mosque remove their shoes prior to entering the building. We would like to avoid placing mats at the entrance due to aesthetic reasons.