Forum quick links
Appendix G, ASHRAE-90.1-2007
NC-2009 EAc1:Optimize Energy Performanceposted by Divjot Singh on
For HVAC System in Baseline case of modelling, it says: "Operate fan contiuously when spaces are occupied and cycle it during unoccupied hours".
School as a TeachingTool - clarifications?
Schools-2009 IDc3:The School as a Teaching Toolposted by Anya Fiechtl on
The Principal at our school project asked a couple of questions about their sustainability curriculum program that I was unable to find a solid answer for: 1.
Paints in parking lot.
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by gabriel Morales on
Mara, I hope you are well, a doubt: the credit applied to the paintings of parking specifically in the paint that goes on the floor to indicate the separation of parking spaces? Parking is underg
Certify ONLY One Office Space Within a Building?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Michelle Bracewell-Musson on
Is EBOM limited to certifying the WHOLE building?
HVAC Control
CI-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
Hello, I'm working in a project that has 2 meeting room of 7 m2 next to each other and one of meeting room is exposed to exterior window.
Manufacturing Plant
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Nelina Loiselle on
My client operates a prosthetics manufacturing plant. There is no benchmark in ENERGY STAR for this kind of facility. I know it will not be eligible for an ENERGY STAR rating.
cooking gas
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Melissa Merryweather on
We have used a modest amount of cooking gas in the canteen of our office building. Should we be counting this in the energy use for the Energy Star rating?
Contractor documentation of compliance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Nathaniel Parrott on
Construction of our project has been completed and ESC plan was followed. We have the superintendant's log reports for all the days silt fence was checked or fixed.
ASHRAE Standard 62.1 - 2010
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Hello, Does anyone know if the ventilation system/strategy of a LEED 2009 project can be designed according to ASHRAE 62.1-2010 instead of 62.1-2007? I haven't looked at the 2010, but I heard the
Lavatory Faucets - gpm
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Teague on
We are having a little trouble with the flow fixture table calculations. We specified Sloan automatic sensing faucets.