How to calculate %
CS-2009 EAc2:On-site Renewable Energyposted by Emmanuel Pauwels on
The reference for the calculation is total energy cost. The output of an array of PV panels is in kwh.
ASHRAE 90.1 Exit signs - Mandatory Provisions
CS-2009 EAp2:Minimum Energy Performanceposted by Bernadette Stauder-Buschlinger on
In the CS- project the exit signs are considered to be a part of the emergency lighting. Therefore the lamps are off during normal operation. The proposed exit sign exceed 5 W per face.
Example of Thermal Calculation ?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Eric JS on
Dear all, Do you have any example of thermal comfort calculation to satisfy this credit? Thanks and cheers!
Need details for each room?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maura Adams on
The review team said we need to highlight and more specifically document the compliance measures for chemical usage areas.
Groups in shower facility - multiple bldgs
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
We have a factory of 4 buldings. All the FTEs/users from all buildings will be using the shower facilities of one of the buildings - bldg "P10".
Occupancy sensors: valid lighting control?
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Amanda Redmond-Neal on
I have an individually occupied "office" (kind of like a coat-check, really) that for some reason was built with only an occupancy sensor and no wall switch.
How to count toilets for handicapped
CI-2009 WEc1:Water Use Reductionposted by Marco Abdallah on
Hi! Our project has highefficient toilets with 3.5/2 ltr/flush. Unfortunately the manufacturer doesn't provide these toilets for disabled restrooms.
Microclimate conditions versus Climate zones by ASHRAE
NC-2009 EAp2:Minimum Energy Performanceposted by Esteban Undurraga on
Hi there, sorry for the long intro and thank you in advance for any feedback, We're trying to specify our Climate data file for LEED simulation purposes.
Fixtures to be included in WEp1 calculations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
We have two lavatories to be used for medical purposes in our buldings: one in the esterelization room of an ambulatory and the other in a medical office.
EAP2 case 2 Our project cannot use Portfolio Manager
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Alicia Villanueva on
We are trying to certify a conference center that has NO category under portfolio manager.