Door proximity

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Elizabeth Crenshaw Hammitt   on 

Is it an issue if the door to the smoking room is under 25 feet away from a door that leads to a porch area?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 1:52 pm

Polycyclic aromatic hydrocarbons, PAH

NC-2009 SSc3:Brownfield Redevelopment
posted by  Tanja Arnesson  on 

Hi, My project just got back our Design 2 review, just after we sent in the design credits for the second review the project found old telephone poles within the ground at our project.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Fri Jul 6, 2012, 6:52 am

Adjustable valve for WC fixtures

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maya Karkour  on 

Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly.

2
Default Avatar
Blackney Hayes Architects
LEEDuser Basic Member
0 thumbs up
Fri Jul 6, 2012, 2:08 am

Compliance through natural ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Udana Ratnayake  on 

We have a canteen area in one of our projects that is to be naturally ventilated through open windows and ceiling fans.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 6, 2012, 1:08 am

IEQc2 - Why haven't we been awarded the credit?

NC-2009 IEQc2:Increased Ventilation
posted by  Mairead Morrissey  on 

Hi, We have an overall 30% ventilation above ASHRAE, for each individual space.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Jul 6, 2012, 12:59 am

ID credit for Green Education- Signage change

NC-2009 IDc1:Innovation in Design
posted by  Valerie Molinski  on 

I have achieved an ID credit for my client in the past, based on fulfilling two of the three requirements of the CIR.

3
Environmental Stewardship Manager
Tarkett North America
LEEDuser Basic Member
64 thumbs up
Thu Jul 5, 2012, 10:20 pm

Sealant field applied by HVAC Contractor

CI-2009 MRc5:Regional Materials
posted by  Marie Kranjack  on 

Should sealants that are field applied by the HVAC Contractor be included in the MR credits? Does the sealant fall under Div.

3
Thu Jul 5, 2012, 8:17 pm

Regional Priority Credit Outside USA

EBOM-2009 RPc1:Regional Priority
posted by  Alfred Rosales  on 

Hi, First and foremost, i would like to commend your team for setting up the LEED-USER - it helps us a lot on our inquiries and clarification on the different credits and pre-requisites. As for my

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Jul 5, 2012, 5:44 pm

Predeveloped SItes

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Carl DI Giacomo  on 

This is mainly a tight math problem to find out to what extent is there flexibilty with the final assessment of square footage allowance Total Site: 96,369 sq.ft.

2
Sustainability Manager
YR&G
LEEDuser Basic Member
151 thumbs up
Thu Jul 5, 2012, 5:11 pm

Space exclusion from ASHRAE 62.1-2007

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Yury Lui  on 

Question: If the rooms are not occupyable rooms, are they subject to the minimum OA rates in the ASHRAE 62.1-2007 standard?

8
Thu Jul 5, 2012, 4:32 pm