One-time potable water analysis

Pilot-Credits WEpc17:Cooling tower water use
posted by  WAGNER OLIVEIRA SILVA  on 

In the new version of Pilot credit Revised at 1/3/2012 they ask to be done one-time potable water analysis. How do we do if our project already covers 100% makeup water with non-potable water?

3
Mon Sep 10, 2012, 1:42 pm

Tenant fit-out and C&S IEQ Credit 3

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Ricardo Sá  on 

Requirements of C&S IEQ Credit 3 also apply to tenants fit-out ?

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Sat Sep 8, 2012, 1:31 pm

Tenant Finish-Out Insulation

CS-2009 EAc1:Optimize Energy Performance
posted by  Heather Holdridge  on 

We're working on a core and shell project and the owner is interested in not installing insulation, but having that as a tenant finish-out item.

3
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Fri Sep 7, 2012, 2:21 pm

Contradiction: Energy Modeling Area and certification fee area

NC-2009 EAc1:Optimize Energy Performance
posted by  Diaa Madkour  on 

Hi all, we have a contradiction here between gross floor area of the energy modeling and the PIF2, in PIF2 we calculated the gross floor area as stated in GBCI : """ Project square footage for cer

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Sep 7, 2012, 1:50 pm

Evapotranspiration data worldwide

NC-2009 WEc1:Water Efficient Landscaping
posted by  Susann Geithner  on 

The new guidance for international projects also includes a resource for evapotranspiration data worldwide.

3
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Fri Sep 7, 2012, 7:23 am

Water Guidance Rationale for "Both-Outside Fixtures Included"

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michelle Rosenberger  on 

If you have fixtures both within and outside your space to serve tenants and you are pursuing WEcr1, what is the documentation rationale for not including the "outside" fixtures in WEpr1 and then d

5
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Sep 6, 2012, 5:12 pm

Documenting a Non 50/50 Gender Split

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michelle Rosenberger  on 

I see discussion about this for NC projects indicating that basically no documentation will suffice to demonstrate compliance with a non 50/50 gender split unless it addresses "the lifespan of the

3
Thu Sep 6, 2012, 3:58 pm

Irrigation Efficiency - IE for Hunter irrigation products

NC-2009 WEc1:Water Efficient Landscaping
posted by  Ricardo Sá  on 

Has anyone have or had any experience with irrigation systems provided by Hunter Indutries? I contacted them in order to obtain information regarding the IE value for their irrigation equipments, a

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Thu Sep 6, 2012, 3:00 am

Task Lighting

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Dominique Arrieta  on 

We have been denied IEQc7.1 due to not showing task lighting at each individual workstation.

3
Thu Sep 6, 2012, 12:50 am

Outdoor seating. Hardscape or not?

Schools-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Carly Ruggieri  on 

A school project of mine will be installing a small amphitheatre-style seating area in the exterior play yard.