Forum quick links
Recycled Content of Steel from Multiple Suppliers
NC-2009 MRc4:Recycled Contentposted by Jerry Reeves on
This is directly from the preliminary review report: 1. Bull Moose Tubing has been reported with a recycled content of 62.5% post-consumer and 37.5% pre-consumer.
PSZ-HP system and preheat coils
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
In the proposed design an AHU is connected to a lot of zones. In that AHU there is a preheat coil. I have to model the baseline model as system 4 PSZ-HP.
CI Review Fee
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Jorge Lopez de Obeso on
We saw the CI Fees table and, since it caused so much impression about having a such small CI Retail and paying the same that a 50000sf project... we just want to make sure that this is it...
Demand control ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, is it true that "Whenever credit is taken for demand control ventilation in the Proposed Case, the outside air ventilation rates for the Baseline Case must be modeled using minimum ASHRA
Option 1 for District Thermal Energy
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modeling a building that is connected to a district CHP system that produces heat and electricity. No cooling system, neither in the building nor in the CHP system, is available.
Definition of "conditioned space"
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, a little question about the definition of "conditioned space".
GREENGUARD certified
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by SIG - Sustainability Main Account on
Does GREENGUARD certified furniture count as a sustainable criteria?
EA Cr 1.3 and District Thermal Energy
CI-2009 EAp2:Minimum Energy Performanceposted by M.S. Chan on
In the 8/13/10 document for Treatment of District or Campus Thermal Energy in LEED V2 & 2009, Appendix A says that District Energy Systems have no effect on any EA section prerequisites or cred
Using Heat Pump for Domestic Water Heating
CI-2009 EAp2:Minimum Energy Performanceposted by M.S. Chan on
We are using heat pumps for domestic water heating. (The water source will be from the campus/district condenser water system.) Can we take credit in the energy calculations using heat pumps?
international project outside US
EBOM-2009 EAc1:Optimize Energy Performanceposted by Sofia Otterheim on
Hi all we are doing a international project outside US. when we started to prepare for this credit we used the energy star portfolio to get a rating for project building.