Forum quick links
Compliance?
CI-2009 EAp2:Minimum Energy Performanceposted by Alex AC on
Hi LEEDuser community, I have read some old posts regarding this issue, but I still want to double check with you guys. I hope you don´t mind.
DES: virtual rate and efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, according to the document “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”, for Option1: Virtual District Hot Water Rate [$/MBTU] =
single stream recycling
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Courtney Royal on
Our project is located in Ithaca, NY and curbside recycling pickup has moved into a single stream recycling collection.
Green Roof modeling for EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi All, I am modeling a 350,000 sqft dormitory/dining hall located in NY. Part of the roof of this building green roof (approximately 10%).
Establishing baseline system
NC-2009 EAc1:Optimize Energy Performanceposted by Kari Krolikowski on
My project consists of the following types of spaces: 1. Office: 2,300 SF 2. Manufacturing / laboratory: 24,055 SF 3. Warehouse: 26,905 SF 4.
Signage Shared?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Joseph Greene on
We are required to designate 12 carpool spaces for our LEED project and plan to install pole mounted signs.
G3.1.2.9 and Miscellaneous Exhaust Fan Power
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Edwards on
Section G3.1.2.9 says that baseline "system fan electrical power for supply, return, exhaust, and relief (excluding power to fan-powered VAV boxes) shall be calculated" using the formulas given.
Performance Period
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Paola Figueiredo, Newton Figueiredo on
Our team submitted a project demonstrating that the building had its performance period for a specific credit done during one (1) year, although the changes and alterations had been made during two
Natural Ventilation - airflow rates
NC-2009 EAc1:Optimize Energy Performanceposted by Sonia Martini on
Hi! The building i need to simulate is naturally ventilated and is located in Italy (climatic zone 4A). Which outdoor air rates must be set in the Baseline and Prosposed Case as natural ventilation
IEQc6 Theater/auditorium controls
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Cristian Wolleter on
Hi, we are working on a theater (capacity: 500 people) and we don't know if we should include lighting and HVAC controls for the audience.