Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tenant commitment for Residential Building in NC Certification

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Melissa Merryweather  on 

I am looking at a mixed-use high-rise project with a residential portion.

2
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Tue Nov 27, 2012, 6:15 pm

Invoice for Wood in Assembly (Display Boards)

NC-2009 MRc7:Certified Wood
posted by  Carly Ruggieri  on 

I've had some major difficulty with documentation for Certified Wood due to small amounts of wood in assemblies, specifically the backing on markerboards/tackboards.

2
Architect / Sustainability Strategist
Perkins+Will
LEEDuser Basic Member
161 thumbs up
Tue Nov 27, 2012, 6:07 pm

Multiple Buildings - Energy Modeling

NC-2009 EAc1:Optimize Energy Performance
posted by  Marina Andrade  on 

Hello, I'm working in a project that consists in a multiple building certification.

5
Default Avatar
Sustainability Consultancy Services
Cushman & Wakefield
LEEDuser Basic Member
11 thumbs up
Tue Nov 27, 2012, 6:01 pm

Worsktation requirements

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  severine secret  on 

If I have a workstation made of Greenguard certified panels, Greenguard plastic laminate but particle board top that has no certification ( even though NAUF), can I still get the credit?

2
Director, Global Product Safety and Compliance
Steelcase Inc.
LEEDuser Basic Member
82 thumbs up
Tue Nov 27, 2012, 2:47 pm

Furniture testing

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  severine secret  on 

If system furniture is manufactured in China and has been evaluated there, can someone at USGBC or SCS testing review the evaluation for possible approval of compliance with the credit requirements

3
Sustainability expert
Go2 Design Studio
LEEDuser Basic Member
10 thumbs up
Tue Nov 27, 2012, 2:40 pm

3rd Party Independent Reviewer as Enhanced CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Lesley Treacy  on 

Hi, I have read through the comments and understand the requirements for the Enhanced Commissioner to be a 'disinterested' or 'independent' body.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 27, 2012, 2:15 pm

onsite waste water treatment plant

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Razan Nejem  on 

if our building is part of a bigger development which has a central waste water treatment plant does this count as being an onsite plant and will it count towards option 2.reducing 50% of building

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 27, 2012, 2:07 pm

Excluding Soil Brought in from Off-site

NC-2009 MRc4:Recycled Content
posted by  Margaret McColl  on 

Hello, I'm working on a project where a very large amount of the soil had to be removed due to contamination (we are pursuing SSc3) and clean soil had to be brought in from off-site.

11
Tue Nov 27, 2012, 1:34 pm

"In Site" basic services - the case of a Shopping Center

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Ricardo Sá  on 

I am working in the LEED certification of a Shopping Centre (Core & Shell) where the following stores will be installed: Bank, Beauty Salon, Laundry, Library, Pharmacy, Post-Office, Restaurant,

8
Tue Nov 27, 2012, 10:28 am

Pre Occupancy Filter Replacement for a Tenant

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Laura Charlier  on 

Is a CI project required to replace the filters of the main building AHU? The project is a 5000 sf office space tenant in a 162,000 sf building (no AHU's in the space).

2
Mon Nov 26, 2012, 10:25 pm