Ballast power

CI-2009 EAp2:Minimum Energy Performance
posted by  Julio Alvarado  on 

Hello, We are doing a CI-Retai. It is 5,814.13ft2 bank branch located in a mall.

2
Sustainable Consultant
INSPEC Sustainability Group LLC
LEEDuser Premium Member
43 thumbs up
Thu Nov 29, 2012, 2:23 am

Fueling Capacity of Charging Stations

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Michelle Rosenberger  on 

We are installing one 240 volt Level 2 electric charging station at our project. The requirement is 3% of total parking, which in our case is apparently 2 stations.

7
Wed Nov 28, 2012, 9:29 pm

Using the LEED User "LEED Materials Calculator" for uploading

NC-2009 MRc4:Recycled Content
posted by  Nelina Loiselle  on 

Has anyone acutally used LEED User "LEED Materials Calculator" for uploading to leedonline for MR credits 4-7 in lieu of transferring the data to the BDC Material Rescourse Calculator?

5
Principal
Sage Design & Consulting
LEEDuser Basic Member
55 thumbs up
Wed Nov 28, 2012, 3:52 pm

Modeling Natural ventilation

NC-2009 EAc1:Optimize Energy Performance
posted by  Kalyan Nishtala  on 

I have a dormitory model where all the suites in the dorms are provided ventilation through operable windows. Ventilation air is solely meant to meet ASHRAE 62.1 requirements.

3
Wed Nov 28, 2012, 3:03 pm

farmland and disturbance limits

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Adam Targowski  on 

1. Does farmland fall under case 1 or 2? 2. Case 1 requires to limit site disturbance. Does it mean that materials storage and all construction facilities have to be within these limits?

3
Wed Nov 28, 2012, 1:54 pm

Combining Option A and B

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  William Thompson  on 

Can Options A and B be combined? Someof the floors are occupied and have met Option B testing requirements.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Nov 28, 2012, 11:51 am

To include or not to include windows

CI-2009 MRc7:Certified Wood
posted by  Christina Welzel  on 

Hello LEEDuser team, do I need to include windows with wooden frames into the calculation? The windows have been fitted during construction stage and were not part of the tenant fit-out.

2
Wed Nov 28, 2012, 7:23 am

farmland

CS-2009 SSc1:Site Selection
posted by  Adam Targowski  on 

In the past most of the site (around 48,000m2) was used as a farmland and a summer plot containing of little houses with little gardens (where people could grow vegetables or flowers).

3
Wed Nov 28, 2012, 12:58 am

Frequency of survey...

CI-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Heather Walters  on 

We just received a question from our certification team asking us to clarify the frequency of the comfort survey?

2
Tue Nov 27, 2012, 8:45 pm

Warehouse and FTE

NC-2009 PIf3:Occupant and Usage Data
posted by  Jean-Baptiste Noel  on 

I am currently working on a building project that is a warehouse (distribution center).

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 27, 2012, 7:01 pm