NC-2009 PIf2:Project Summary Details
posted by  charles bell  on 

I can't change the zip code on PI f2. Is this linked to some other form?

2
Wed Dec 12, 2012, 3:30 pm

ECS - Other clg Accessories under Primary Cooling

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivy Chen  on 

We would like to find out what have been included in item "Other Clg Accessories" under Primary Cooling in Energy Consumption Summary. In our baseline, Package Terminal Heat Pump is adopted.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Dec 12, 2012, 3:15 am

9.4.1.1 mandatories for CS

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Hi everyone! If the project base building scope does not include the lighting fixtures for tenant spaces but wiring stub-outs are, do we still need to have the automatic control device for the "bu

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Dec 11, 2012, 11:47 pm

Water Use Threshold for Credit Eligibility

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Adam Shelly  on 

There should be some sort of water use threshold that the project needs to exceed in order to be eligible for the credit.

2
Tue Dec 11, 2012, 9:50 pm

FSC Mixed vs FSC Recycle on Invoices?

NC-2009 MRc7:Certified Wood
posted by  John Casciato  on 

If my invoice says FSC Mixed for an MDF order, even tough MDF is a recycle product by design, would that go towards MRc4 instead of MRc7 even if the invoice says FSC Mixed?

4
Default Avatar
Certified Wood Products, Inc
LEEDuser Basic Member
0 thumbs up
Tue Dec 11, 2012, 8:33 pm

Does 62MZ calculations needed?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Dorilee Torres  on 

I am working with a facility to determine if they can meet the prerequisite for the LEED EBOM. Currently the facility has 12 AHU's, some of them working for the same single space.

3
Tue Dec 11, 2012, 7:41 pm

FSC assembly requirement for LEED

NC-2009 MRc7:Certified Wood
posted by  Paul Setzer  on 

Per LEED requirements, woodworkers now have to be FSC certified in order to qualify for the MRc7 point contribution.

3
Tue Dec 11, 2012, 6:09 pm

summary for mechanically ventilated spaces

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  BH .  on 

So briefly (for C&S mechanically ventilated spaces): For densly occupied spaces we need: CO2 monitors and i.e.

6
Tue Dec 11, 2012, 5:41 pm

Process energy

NC-2009 EAc1:Optimize Energy Performance
posted by  Jatuwat Varodompun  on 

I got the reviewed comment on the process energy. The way I have modelled is try to add the process load to reach 25% minumum energy threshold eventhough such load does not exist.

6
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Dec 11, 2012, 4:02 pm

Cooling Fuels

CI-2009 EAc3:Measurement and Verification
posted by  Nandana Kumar  on 

Hi, We need a clarification about the cooling fuels. What are cooling fuels referred to? Thank you Nandana

3
Default Avatar
Deputy General Manager
LEAD Consultancy & Engineering Services
LEEDuser Basic Member
6 thumbs up
Tue Dec 11, 2012, 2:23 pm