Which Parking Areas to Include?

NC-2009 PIf2:Project Summary Details
posted by  Kevin Flynn  on 

I am beginning work on a fairly complex project. The portion of the project seeking LEED certification is an office building attached to an existing building.

2
Wed Mar 13, 2013, 1:39 am

CS and CI fee relationship

NC-2009 PIf2:Project Summary Details
posted by  Melissa Merryweather  on 

I have a project where we are doing a CS certification for the building owner and a CI project for the main tenant at the same time. I was about to submit both for Preliminary Certification.

3
Wed Mar 13, 2013, 1:14 am

Certifying one LEED building on a campus

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Lisa Sawin  on 

We have currently drawn our LEED boundary to include all areas that our building/scope of work is impacting.

2
Wed Mar 13, 2013, 12:09 am

Data Centers - Efficiency for UPS and computer servers for the

NC-2009 EAp2:Minimum Energy Performance
posted by  Carlos Garcia  on 

Dear all We're working in the energetic simulation for the credit EA p 2 in LEED NC 2009 in a Data Center building.

5
Tue Mar 12, 2013, 10:08 pm

Natural Ventilation: Which spaces are to be considered?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marco Abdallah  on 

1. Are only regularly occupied spaces to be considered or all generally spaces (including stairs, corridors, storage and technical rooms)? 2.

4
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Tue Mar 12, 2013, 5:08 pm

Thermal Comfort (IEQc 7.1) for Industrial Applications

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Ismaiel Salama  on 

We are targeting this credit for a project with more than 70% of the buildings are utilised for industrial, processing, storage and manufacturing activities.

4
Tue Mar 12, 2013, 3:50 pm

Understanding how hazardous materials effect calculations

NC-2009 MRc2:Construction Waste Management
posted by  Renee Shirey  on 

Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition.

6
Mon Mar 11, 2013, 10:43 pm

Form Template Compliance

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Erin Cowan  on 

We are working with a University that collects everything but Glass however that is detailed out in the special circumstances.

2
Sustainable Project Manager
KEMA Services
LEEDuser Basic Member
28 thumbs up
Fri Mar 8, 2013, 10:35 pm

Option 3, share whole bldg energy and water data

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Courtney Royal  on 

Hello! This may be a stupid question, but I am reviewing the requirements for EAc5.1 and came across Option 3.

2
Fri Mar 8, 2013, 10:34 pm

Total for Division 12-Reused Furniture Amount PLUS Cost of New??

CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishings
posted by  Michelle Bracewell-Musson  on 

The higher the amount for reused furniture, the higher the number for Total Division 12, therefore more difficult to obtain the 30%. Ex.

4
Fri Mar 8, 2013, 10:32 pm