updated spreadsheet

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Tristan Roberts  on 

LEEDuser has updated the Sustainable Food Purchases Tracking Sheet in our Doc Toolkit. (see above)

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 8, 2013, 12:47 am

Underground parking compliance with the c7.1 requirements

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  BABAR MEHMOOD  on 

We have a project in Riyadh, and 92 % parking is under ground ( 2 basements for parking) so we are complying the 50% parking requirements which donot require SRI Roof.

2
Sustainability Coordinator
Webcor Builders
LEEDuser Basic Member
40 thumbs up
Thu Mar 7, 2013, 6:53 pm

Option 2: ASHRAE Advanced Energy Design Guide

NC-2009 EAc1:Optimize Energy Performance
posted by  Heather Holdridge  on 

We are following the option 2 ASHRAE AEDG presciptive path for a project. One of the AEDG requirements for HVAC is for a heat pump >135 kBtuh to be at minimum 10.1 EER or above.

3
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Thu Mar 7, 2013, 5:45 pm

VRF systems and outside air modeling

NC-2009 EAc1:Optimize Energy Performance
posted by  Robert Sutton  on 

Has anyone done a VRF system serving various zones using say heat pump VRF units and then providing outside ventilation air from a separate dedicated unit serving the same various zones?

19
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 7, 2013, 3:02 pm

COP CHILLER BASELINE

NC-2009 EAp2:Minimum Energy Performance
posted by  VICTOR MORENO  on 

Hi, I have to recalculate the chiller COP of Baseline Building, to consider the power of the fans? Or just put the COP marked by Standard 90.1 and attributed the fan power calculated by the Stan

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 7, 2013, 1:44 pm

when is the weatherproofing enclosed

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jaida Anderson-Lozano  on 

We are building a 13 story building that will have the envelope panels in place two years before all openings will be enclosed.

4
Default Avatar
Architect, LEED Consultant
Polk Stanley Wilcox Architects
LEEDuser Basic Member
29 thumbs up
Thu Mar 7, 2013, 2:53 am

Training Program?

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Robert Andrews  on 

Any suggestions on a source for templates that can be used to document a staff training program? I am actually working with LEED EB v2.0, EAc3.1. Thanks!

6
Director of Energy Services
Environmental Building Strategies
LEEDuser Basic Member
38 thumbs up
Wed Mar 6, 2013, 10:24 pm

Educational building program

NC-2009 IDc1:Innovation in Design
posted by  Diaa Madkour  on 

hi, Anyone has a reference or sample of the educational building program plan? and can anyone experienced through this credit advise about what is needed for its documentation?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 6, 2013, 8:16 pm

Heat Pipe Simulation for EAc1

NC-2009 EAc1:Optimize Energy Performance
posted by  Kai Andrade  on 

How do I simulate a heat pipe in the Baseline case? The proposed case has two split DX AHUs serving 22 & 15 zones respectively.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 6, 2013, 8:12 pm

Meeting EAp2 in Zone 1 without A/C?

NC-2009 EAc1:Optimize Energy Performance
posted by  Katrina Morgan  on 

We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning.

4
Default Avatar
Principal
Fermata Consulting, LLC
LEEDuser Basic Member
0 thumbs up
Wed Mar 6, 2013, 5:35 pm