Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Extended Stay?

CS-2009 SSc2:Development density and community connectivity
posted by  Sara Neff  on 

Hello, my project is close to all required services, and many extended stay facilities. Do extended stay facilities count towards the residential requirement?

2
Thu Jun 20, 2013, 6:08 pm

FSC 100% Pure Wood Doors

Schools-2009 MRc7:Certified wood
posted by  Ema S  on 

Are there any manufacturers that provide FSC 100% PURE wood doors?

3
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Thu Jun 20, 2013, 12:43 pm

Recycling Rooms

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Saju Varghese  on 

Should recycling rooms be included in this credit?

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Wed Jun 19, 2013, 11:11 pm

Scooter Parking

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Mark Cloud  on 

I have a athletic project on a college campus where most student athletes using the facility would arrive via scooter.

2
Wed Jun 19, 2013, 7:50 pm

Community Connectivity

NC-2009 SSc2:Development density and community connectivity
posted by  Jessica Garcia  on 

I have two questions: 1. Is a daycare center considered a basic service? 2. Can I have more than one school listed in basic services?

4
Default Avatar
CEO
WAWA- green building consultancy
LEEDuser Basic Member
3 thumbs up
Wed Jun 19, 2013, 2:07 pm

unit (cf/storm)

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Ameet AA  on 

My project is using Option 1: Design stroms,Case 2 :Site with existing imperviousness mote than 50% LEED online template V 5.0 Table 6.1-3 Site runoff: Two year,24 hour Design storm quantity is r

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Wed Jun 19, 2013, 12:06 pm

ablution fixture

NC-2009 WEp1:Water use reduction
posted by  Erin Holdenried  on 

I assume an ablution fixture used to wash before entering a prayer room would have to be considered in the water use calculations. What would the baseline rate of the fixture be?

5
Tue Jun 18, 2013, 8:38 pm

Using EBOM MRc8 as a LEED-NC ID Credit

EBOM-2009 MRc8:Solid waste management - durable goods
posted by  Susan Di Giulio  on 

We have suggested that our client for a tech-intensive LEED-NC office project use E-waste recycling for an ID credit.

2
Tue Jun 18, 2013, 7:54 pm

Non-US Green-E Available?

CS-2009 EAc6:Green power
posted by  Yoyo Shek  on 

Do anyone know if the Green-E supplier is limited in US?

3
Default Avatar
Allied Environmental Consultants Limited
LEEDuser Basic Member
3 thumbs up
Tue Jun 18, 2013, 2:56 pm

Definition of offices

CS-2009 IEQc8.2:Daylight and views - views
posted by  Ron Dean  on 

Hi, I want to know in the case that the building owner will rent all building offices, and design plans have a projected plant design free (without Closings) but the internal regulations of tenant

3
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Mon Jun 17, 2013, 11:26 pm