Forum quick links
polyisocyanurate roof insulation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Allen Cornett on
Does polyisocyanurate roof insulation on top of a concrete or metal deck need to be included in the documentation of the low-emitting materials insulation category?
Circular Products -Pilot Credit Attempt
Pilot-Credits MRpc131:Circular Productsposted by Patty Lloyd on
Hello, I am attempting this pilot credit and am finding a couple of the pathways to be difficult to achieve.
What qualifies as a carshare program?
NC-v4.1 LTc7:Reduced Parking Footprintposted by Jill Kurtz on
Do we have any idea of what qualifies as "car share" program under option 3? We are helping design a buildnig on a golf course and there are vehicles for employees to use around the facility.
Professional/Private Sports Field as Open Space?
NC-v4 SSc3:Open spaceposted by Angi Rivera on
We have a stadium project that is open air, so the grass turf field is not covered. However, the field is not publicly accessible at any time.
Option 1: Climate Related Risk Management Planning Step
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Marina Rullo on
Our firm pursued this credit for a project site in Baltimore, MD. I found that the prerequisite and Option 1 overlap a great deal, especially when they are presented in the same worksheet.
C&DWM Campus credit
NC-v4 MRc5:Construction and demolition waste managementposted by Geoffrey Brock on
The LEED reference guide has the C&DWM Planning Pre-req as eligible for Campus credit, but the actual C&DWM credit has Campus INeligible (both are eligible for Group). Why?!
Upgrade from LEED v4 to LEED v5
NC-v4 SSc2:Site development - protect or restore habitatposted by Theresa Lehman on
Does anyone know if projects registered in LEED v4 are eligible to upgrade to LEED v5 for specific credits?
Pilot INpc155 and DoD construction
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Alison Kerr on
This pilot credit is our first go-to in our office because we work on DoD projects, and the requirements are already covered under UFCs. No design impact.
Meeting Acoustic Performance Credit requirements for a furniture factory
NC-v4.1 EQc9:Acoustic Performanceposted by Junaid Mujahid on
Hi forum users!
A furniture factory project I'm working on is attempting to target the LEED v4.1 NC Acoustic Performance credit.
Project Details:
Autocase inputs slightly different than LEED Outputs
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Jill Kurtz on
We use the Autocase tool for this innovation credit and find some of the inputs they require are slightly different than how LEED outputs information.