Partially Irrigated Site

NC-2009 WEc1:Water efficient landscaping
posted by  William Weaver  on 

This question is somewhat related to Leah's question dated 1.23.2012, but a different circumstance.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Wed Oct 16, 2013, 7:33 pm

Combined approach to WEc2

NC-2009 WEc2:Innovative wastewater technologies
posted by  Michael Wironen  on 

We have a project where, through efficient fixtures, we will reduce wastewater (WCs, lavatories, and showers) conveyance by approximately 45%.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Oct 16, 2013, 3:38 pm

Custom wood base - offsite millwork finishes included?

CI-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Vince Briones  on 

Hi all, Just seeking confirmation as a situation pertaining to hardwood floor base.

3
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Oct 16, 2013, 1:03 pm

PV System as part of a Master Site

CS-2009 EAc2:On-site renewable energy
posted by  Ben Tucker  on 

Does anyone have any experience submitting for EAc2 as part of a Master Site? Our project is a campus project that will contain three buildings.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Tue Oct 15, 2013, 8:48 pm

Gross Square Footage and Building Footprint.

NC-2009 PIf2:Project Summary Details
posted by  Lynne Martin  on 

Our project is a one story learning/conference center. In this case is the gross square footage the same as the building footprint?

3
Default Avatar
Interior Designer
Diversified Design Group LLC
LEEDuser Basic Member
1 thumbs up
Tue Oct 15, 2013, 8:34 pm

Testing Exhaust Fans

EBOM-2009 IEQp1:Minimum indoor air quality performance
posted by  cathy keagle  on 

Does anyone have advice for a building where we are unable to find the drawings which specify the Design CFM for some of the exhaust fans?

3
Tue Oct 15, 2013, 7:02 pm

Baseline for hospitals

NC-2009 EAp2:Minimum energy performance
posted by  Lise Dannesboe  on 

Hej! As there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for hospitals?

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Tue Oct 15, 2013, 3:50 pm

Data Centers baseline

NC-2009 EAp2:Minimum energy performance
posted by  Gustav Alfaro  on 

Hi to all: We are modeling a data center under LEED v2009, but we need to show savings in the process loads (servers, UPS and transformers) since the achieved savings in HVAC and lighting systems

3
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
10 thumbs up
Tue Oct 15, 2013, 3:39 pm

Complicated CHW distribution & pump energy

NC-2009 EAp2:Minimum energy performance
posted by  Charline SEYTIER  on 

We are facing a complicated CHW distribution in one of our energy model, we have 2 chillers feeding a constant flow primary loop that serve heat exchangers. From the heat exchangers start several

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Tue Oct 15, 2013, 3:07 pm

Metering Faucets - why the "standard" requirement/limitation?

NC-2009 WEp1:Water use reduction
posted by  Michelle Robinson Schwarting  on 

There's been a lot of talk recently about the auto-control / metering faucet requirement in LEED via the "Water Use Reduction Additional Guidance" document.

3
Default Avatar
Architect, LEED Consultant
Polk Stanley Wilcox Architects
LEEDuser Basic Member
29 thumbs up
Tue Oct 15, 2013, 2:42 pm