Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Modeling HVAC System #8: VAV with PFP boxes

NC-2009 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

Dear Forum, We are modeling a high rise building in order to comply with EAp2 minimum energy performance.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Tue Oct 22, 2013, 10:04 pm

Fume Hood Testing ASHRAE 110 & ECARO

NC-2009 IDc1:Innovation in design
posted by  Tze Higby  on 

This is a new built Laboratory/Manufacturing buiding.

2
Tue Oct 22, 2013, 5:30 pm

Occupancy Date Changes

NC-2009 PIf4:Schedule and Overview Documents
posted by  Daniel McDonald  on 

Should we be updating the dates on this form if/as the actual schedule changes?

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Oct 22, 2013, 12:41 pm

Calculating Total Daily Occupancy (Visitors) for MF High Rise

NC-2009 PIf3:Occupant and Usage Data
posted by  Lance Collins  on 

Hi, I'm working on a EBOM project for a high rise apartment building. There is no retail in the project, but there are obviously still visitors.

2
Mon Oct 21, 2013, 11:08 pm

Performance Period Question

EBOM-2009 IEQp1:Minimum indoor air quality performance
posted by  Nelina Loiselle  on 

On this same note, what do you all think about this situation: we have all our OA measurement done for each AHU and all are complying except 1 because the TAB contractor thought it was acceptable t

2
Mon Oct 21, 2013, 9:27 pm

LEED Platinum Maintenance

NC-2009 EAc1:Optimize energy performance
posted by  Karl Heitman  on 

Other than sharing the monthly energy bills, is there annual reporting / audits that are required to maintain platinum status?

6
Sustainability Director
Lake|Flato Architects
LEEDuser Premium Member
78 thumbs up
Mon Oct 21, 2013, 8:00 pm

Ventilation Rate for Occupied Warehouse

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Silvia Ruiz  on 

Hi, I am working on a project that consists of a two-story office building attached to a warehouse.

3
Mon Oct 21, 2013, 3:19 pm

Modelling Existing Heating Plant serving new Extension

NC-2009 EAc1:Optimize energy performance
posted by  Dónal O'Connor  on 

Hi all, I'm looking for some guidance on modelling a heating system for a new school extension that will be served from the existing boiler system. One of the options for a new school extension i

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Mon Oct 21, 2013, 2:43 pm

Playfields?

NC-2009 SSc5.2:Site development - maximize open space
posted by  Omer Moltay  on 

(1) Would hardscape playfields such as basketball court count towards the pedestrian oriented hardscape? (2) What about turf surface soccer field?

3
Default Avatar
LEED BD+C O+M
Carde Ten Architects
LEEDuser Basic Member
74 thumbs up
Mon Oct 21, 2013, 2:02 pm

New parking on an existing campus

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Helen Kessler  on 

Our project is a new classroom building on an existing campus.

3
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Fri Oct 18, 2013, 1:54 pm