Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Service Hot Water

CS-2009 EAp2:Minimum Energy Performance
posted by  Anna Korinkova  on 

Dear fellow LEEDusers. Our base building (C&S) has not included a service hot-water system (it will be installed by tenants later) and therefore we modelled the Proposed Building Performance an

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Thu Feb 27, 2014, 3:41 pm

Land Trust Approach - Donation of $ vs Donation of Land

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Abena Darden  on 

Hell all - I've been trying to understand the requirements of the SS 5.1 ACP which allows donation of offsite land in trust.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 26, 2014, 8:19 pm

U Value & SHGC

NC-2009 EAp2:Minimum Energy Performance
posted by  SSN Energy Model  on 

Hi, We are in the process of doing Energy Simulation for Garments Factory. We have completed the base case part and proposed case is pending.

4
Wed Feb 26, 2014, 6:46 pm

minimum air flowrates in Baseline Case

NC-2009 EAp2:Minimum Energy Performance
posted by  Charline SEYTIER  on 

Hi, We are in the process of responding to the comments we received from the reviewers on the energy model of one of our project performed with eQuest. The reviewer is asking us to provide an inpu

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Wed Feb 26, 2014, 6:37 pm

Calculation Issue

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Farah A.  on 

A building pursuing the Development Density and Community Connectivity credit is located within a 2 acres community (8,093,m²), in which existing buildings total 90,000 sq. ft (8,361 m²).

3
Default Avatar
LEEDuser Basic Member
7 thumbs up
Wed Feb 26, 2014, 4:37 pm

HVAC baseline system

NC-2009 EAp2:Minimum Energy Performance
posted by  Gabriela Crespo  on 

Dear all, I have a question regarding an HVAC baseline model for systems 7 and 8. We have a project located in a very arid zone, where water is very limited.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Feb 26, 2014, 3:30 pm

System manages the 1:5 and 1:100 year event - compliant?

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Lindsey Kindrat  on 

In my region, the DP requires that the major storm system be designed to convey runoff from the 1:100yr event (and minor system to convey the 1:5yr event).

3
Executive Director, Principal Sustainable Building Specialist
3 Point Environmental Inc.
LEEDuser Basic Member
3 thumbs up
Wed Feb 26, 2014, 1:49 pm

Multiple forms reqt. for AGMBC approach-LEED EBOM 2009 WEp1, C1

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Kevin Sullivan  on 

Hi We are using the group approach under AGMBC ( Application Guide for Multiple Buildings and On-Campus Building Projects) guide for six buildings under the project's scope.

3
Default Avatar
Director
Leap Sustainability Design Consulting
LEEDuser Basic Member
9 thumbs up
Wed Feb 26, 2014, 10:00 am

LEED Exam question

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Farah A.  on 

All of the following are true of IEQ Credit 7.2- Thermal Comfort- Verification except: A. The credit requires surveying building occupants B.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Feb 25, 2014, 8:44 pm

CIR Help

NC-2009 PIf4:Schedule and Overview Documents
posted by  Farah A.  on 

Need help on this question, as I received two different sets of answers! After submitting the Design Review for a project, a project team receives several clarification requests from the project

3
Default Avatar
LEEDuser Basic Member
7 thumbs up
Tue Feb 25, 2014, 8:35 pm