Option 2, path 1 - 50% reduction of total water applied

NC-2009 WEc1:Water Efficient Landscaping
posted by  Lise Dannesboe  on 

HI! We would like to pursue Option 2, path 1 and dimension the rainwater tank for supplying 100% of the irrigation needs.

6
Fri Jun 6, 2014, 2:27 pm

Fresh air provided by transfer grill

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maya Karkour  on 

Dear all, I am consulting on a big project which has small electrical rooms (~30 sq.ft) in the mechanically ventilated parking basement.

8
Fri Jun 6, 2014, 2:10 pm

Using the Assembly Calculator for Gyp Wall assemblies

CI-2009 MRc4:Recycled Content
posted by  Charles Nepps  on 

I know this is kind of out there, but we have a situation where the GC has only provided unit pricing for wall assemblies (per sf) and not a cost breakdown of the individual components.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Jun 6, 2014, 1:27 pm

Roof Anchors

NC-2009 MRc4:Recycled Content
posted by  MT A  on 

Roof anchors are permanently installed - can they be included in the calculations? I've seen them specified in Division 7 under roofing, Division 11, and perhaps can bu under Division 10.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Fri Jun 6, 2014, 11:00 am

Shower location

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  K Nakamura  on 

The 200 yard rule applies to bicycle racks outside of the project boundary but how about public showers outside of the project boundary?

7
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Jun 5, 2014, 6:22 pm

AHU in IT Room

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Silvia Ruiz  on 

Hi, I have two short questions: 1. Would an IT Room require a minimum ventilation rate if it is an infrequently occupied space?

4
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Jun 5, 2014, 4:18 pm

EQc3, EQc5 and filtration requirements

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Steve Loppnow  on 

I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.

3
Thu Jun 5, 2014, 2:55 pm

Projects outside the US

CI-2009 EAc4:Green Power
posted by  Mike D  on 

The project is located outside the US where Green-e suppliers are not present. The project is thus looking at buying Green-e RECs.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 5, 2014, 1:30 pm

Electric Instantaneous water heater

NC-2009 EAp2:Minimum Energy Performance
posted by  CT G  on 

Hi, The design team is specifying an electric instantaneous water heater on a project we are working with.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 4, 2014, 3:57 pm

MERV 13 filtration required? Need some opinions here...

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  David Gibney  on 

In order to comply with LEED IEQc5, do we need to provide MERV-13 filters for the supply air of a very large warehouse? The warehouse is expected to be “regularly” occupied.

2
Partner, Architecture & Sustainability
DIALOG
LEEDuser Premium Member
449 thumbs up
Wed Jun 4, 2014, 9:57 am