Weighted Average of Renovated and Addition energy saving targets

NC-2009 EAp2:Minimum Energy Performance
posted by  Emmanuel Miranda  on 

Hello, I've searched the forum but haven't found a definite answer.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 9, 2014, 6:36 pm

Modeling infiltration in the baseline case for an existing bldg?

NC-2009 EAp2:Minimum Energy Performance
posted by     on 

I put this comment in a reply below, but I'm afraid it wont be seen, so I'm starting a new thread... We are renovating an existing historic building which included window replacements, furring out

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 9, 2014, 6:36 pm

Baseline hvac system for data center

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Charalampos Giannikopoulos  on 

I'm trying to do my first model for a data center and looking at the table in appendix g of ashrae 90.1.2010 for the hvac system that I have to follow for the baseline model I can't understand if t

4
Wed Jul 9, 2014, 5:22 pm

Energy Modeling Procedure for a Data Center

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

We are working on a project that is seeking the LEED NC 2009 Certification.

10
Wed Jul 9, 2014, 4:18 pm

Determining Option 1 or Option 2

CI-2009 EAc3:Measurement and Verification
posted by  Michelle Rosenberger  on 

Our specific LEED CI project is definitely less than 75% of the building. But our client for the CI we are pursuing occupies the whole building.

4
Default Avatar
Engineer
Kent Consulting Engineers
LEEDuser Basic Member
0 thumbs up
Wed Jul 9, 2014, 3:53 pm

Rational Method

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  MKK LEED  on 

Good Morning, I’m starting with calculations in SS credit 6.1. But I have a question: Can I use the runoff data of the watershed where is located the project?

4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Jul 9, 2014, 1:48 pm

Sun Control Window Films

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Julien Lafond  on 

This project with large window areas is installing sun control window films which rejects 72% total solar energy and gives 66% of solar heat reduction.

2
Wed Jul 9, 2014, 1:53 am

HVAC Systems Selection for Baseline

CS-2009 EAc1:Optimize Energy Performance
posted by  Mark Stromberg  on 

My question is regarding the following procedure as outlined in Trace 700 help: "To determine which ASHRAE baseline system to model, refer to ASHRAE Standard 90.1-2007, Table G3.1.1A (below).

9
Wed Jul 9, 2014, 1:39 am

Chemical/Hazardous Gas Area Separation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Brian Harris  on 

We have a project that has a garage which has storage, mechanical and other occupied spaces accessed through doors.

3
Default Avatar
Principal
TCA Architecture Planning
LEEDuser Premium Member
5 thumbs up
Mon Jul 7, 2014, 10:13 pm

Electric instantaneous water heater

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  CT G  on 

Hi, The design team is specifying an electric instantaneous water heater on a project we are working with.

5
Default Avatar
LEEDuser Premium Member
19 thumbs up
Mon Jul 7, 2014, 10:08 pm