Forum quick links
Handicap Access
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Mary Grace Wong on
Our building has a separate main entrance and handicap access (which includes an elevator to travel between street level and lobby vertically).
Column Veneer preserved but covered
NC-2009 MRc2:Construction Waste Managementposted by Madhura Dhayagude on
We are working on a project where the client wants to preserve the existing column veneer, however they want to cover the whole column with a new finish.
Option 2 Simulation
NC-v4 EQc7:Daylightposted by Charalampos Giannikopoulos on
For Option 2 (Simulation) is it accepted to run the simulation for 9.00 and 15.00 on September 21 only, or should it be repeated for March 21st and get the average of both?
Fixtures included in WEp1.
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Bernardo Ruiz Montoya on
Hi, I believe that I already know the answer but I want to present my doubt to you as a double-check.
Energy Model Scope - Shared HVAC Plant
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by TOMAS URIBE on
Hello there. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.
Exterioir Lighting - Non tradable
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project I'm modeling, in the Proposed project there is a Building facades exterior lighting which LPD is bigger than the allowed values of 0.2 W/ft2.
Definition Parking space
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Hanne Goa on
Is car space for goods deliveries considered parking space aswell? This is a place for pick up and delivery of goods only (parking not allowed) Thank you!
USGBC DES Guidance - Option 1
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I just want to verify one thing regarding DES Option 1 (building stand-alone scenario): The cooling & heating are modeled as purchased energy (with identical energy rates $) in both
Do drawings need to have imperial units?
NC-2009 PIf4:Schedule and Overview Documentsposted by Nicole Kimoto on
I'm working on a federal project, and all dimensions are currently in metric. Does anyone know if LEED now accepts this or do I need to change to imperial units?
timing on remediation - done before construction
NC-2009 SSc3:Brownfield Redevelopmentposted by Chris Flint Chatto on
Hello.