Installing CO2 devices in non-densely occupied spaces

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Marina Andrade  on 

To comply if the requirements of this credit, could we installed CO2 devices, instead of outdoor airflow mesurement device, in non-densely occupied spaces?

4
Project Manager
New Buildings Institute
LEEDuser Basic Member
1 thumbs up
Tue Feb 3, 2015, 10:48 am

"Preferred" Parking = reserved, cannot be used by others?

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Eric Thompson  on 

I have a project where we only have 3 parking spaces provided, resulting in a substantial reduction from the baseline. However, the client is reluctant to reserve these exclusively for carpools/va

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 3, 2015, 6:51 am

Low-temperature chemical dishwashers

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Susan Di Giulio  on 

The kitchen consultant on our project has specified a Hobart LT-1 LOW-TEMP CHEMICAL DISHWASHER. While most Hobart products are E-Star, this one is not.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 2, 2015, 4:40 pm

DES Option 2 – CHP with absorption chiller

NC-2009 EAc1:Optimize Energy Performance
posted by  Qian Tang  on 

Hello, We are working on a LEED NC 2009 project with DES which the thermal plants consist except boilers and electric chillers also a cogenerator and an absorption chiller. We are thinking to follo

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 2, 2015, 10:47 am

Footprint, at grade or below grade?

NC-2009 PIf2:Project Summary Details
posted by  Maria Porter  on 

Hi! I have a question similar to the one posted on Nov 18 2013 below.

2
Mon Feb 2, 2015, 7:10 am

Distributors location for MR c5

NC-2009 MRc5:Regional Materials
posted by  María Fernanda Aguirre  on 

Hi there! Regarding regional materials do distributors facilities need to be counted within the 500 miles radius?.

5
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Fri Jan 30, 2015, 11:28 pm

Regional Steel

NC-2009 MRc5:Regional Materials
posted by  Chris Klehm  on 

We have steel on a project that is documented to be 99% recycled content, all recovered within 500 miles of the project site.

6
President
Energy & Environmental Solutions
LEEDuser Basic Member
0 thumbs up
Fri Jan 30, 2015, 8:41 pm

Crushed concrete

NC-2009 MRc4:Recycled Content
posted by  Hrvoje Kvasnicka  on 

We will be using crushed concrete from an exiting building on site for subbase for access road. I understand this cannot be used for MRc3 Material Reuse, but rather for MRc4.

5
LEED AP BD+C
ILTAY
LEEDuser Basic Member
3 thumbs up
Fri Jan 30, 2015, 4:43 pm

Modeling Water-source Variable Refrigerant Volume Systems

NC-2009 EAp2:Minimum Energy Performance
posted by  Eric Webber  on 

Hey everyone, I have a question about the best software choice and modeling strategy for water-source VRV (or VRF) systems.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 30, 2015, 3:59 pm

MR Project boundary in multi story building

CI-2009 MPR2:Must be a complete, permanent building or space
posted by  Kathleen Burke  on 

the building is 11 stories with an atrium. The tenant is taking part of 1, all of 2, part of 3, all of 4, NONE OF 5, half of 6 and all of 7.

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Fri Jan 30, 2015, 7:29 am