Forum quick links
Installing CO2 devices in non-densely occupied spaces
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Marina Andrade on
To comply if the requirements of this credit, could we installed CO2 devices, instead of outdoor airflow mesurement device, in non-densely occupied spaces?
"Preferred" Parking = reserved, cannot be used by others?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Eric Thompson on
I have a project where we only have 3 parking spaces provided, resulting in a substantial reduction from the baseline. However, the client is reluctant to reserve these exclusively for carpools/va
Low-temperature chemical dishwashers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Di Giulio on
The kitchen consultant on our project has specified a Hobart LT-1 LOW-TEMP CHEMICAL DISHWASHER. While most Hobart products are E-Star, this one is not.
DES Option 2 – CHP with absorption chiller
NC-2009 EAc1:Optimize Energy Performanceposted by Qian Tang on
Hello, We are working on a LEED NC 2009 project with DES which the thermal plants consist except boilers and electric chillers also a cogenerator and an absorption chiller. We are thinking to follo
Footprint, at grade or below grade?
NC-2009 PIf2:Project Summary Detailsposted by Maria Porter on
Hi! I have a question similar to the one posted on Nov 18 2013 below.
Distributors location for MR c5
NC-2009 MRc5:Regional Materialsposted by María Fernanda Aguirre on
Hi there! Regarding regional materials do distributors facilities need to be counted within the 500 miles radius?.
Regional Steel
NC-2009 MRc5:Regional Materialsposted by Chris Klehm on
We have steel on a project that is documented to be 99% recycled content, all recovered within 500 miles of the project site.
Crushed concrete
NC-2009 MRc4:Recycled Contentposted by Hrvoje Kvasnicka on
We will be using crushed concrete from an exiting building on site for subbase for access road. I understand this cannot be used for MRc3 Material Reuse, but rather for MRc4.
Modeling Water-source Variable Refrigerant Volume Systems
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Webber on
Hey everyone, I have a question about the best software choice and modeling strategy for water-source VRV (or VRF) systems.
MR Project boundary in multi story building
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Kathleen Burke on
the building is 11 stories with an atrium. The tenant is taking part of 1, all of 2, part of 3, all of 4, NONE OF 5, half of 6 and all of 7.