Forum quick links
LEED v3 CS: IEQ8.1 and 8.2 - How to Calculate Zone Floor Area
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Maggie Hogan Skaug on
This project is a high rise mixed-use office building pursuing LEED Core & Shell certification with no or limited tenant build-out plans.
TAB Report and Calculations
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Tom Liebel on
We have just received a request for additional clarification during our final review of our LEED-EBOM 2009 submission, asking us to confirm the date of our TAB report, and pointing us to the the Ca
NC-2009 SSc2: Development Density and Community Connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Bouygues Sustainability on
Hi everyone, We are certifying a Hotel. I want to know if we can count in this credit Option 2 the services offered by the hotel. Txs
Controller Efficiency
NC-2009 WEc1:Water Efficient Landscapingposted by Michelle Rosenberger on
I see several threads attempting to get an answer on how one demonstrates controller efficiency and the most prevalent answer seems to be just use 1 because no other values can be substantiated by
How does LEED SSc6.1 calculate "Imperviousness"?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian O'Mara on
How does LEED SSc6.1 calculate "Imperviousness"?
OA calculation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Indochine Engineering VN on
Hi, I just received the feedback from reviewer. We have AHU to supply 100% OA to the space and FCUs for secondary recirculation.
FSC certified 100%pre-consumer recycled wood fiber
NC-2009 MRc7:Certified Woodposted by cathy keagle on
If the particle board is FSC certified 100%pre-consumer recycled wood fiber, can this be considered for credit MR 7. In other words can this be considered 100% new wood and 100% FSC certified?
Site Condition
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Razan Nejem on
If a site is not previously developed, However its a desert site with no type of vegetation and located in an Urban area.
SS Cr 2 1/2 mile radius
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Elena Gonzi on
Good morning, we have an area with 4 building. We are certifying each building with a different certification (3 New construction and 1 Commercial interior).
AC Split units as misc. load
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Markus, There is an issue with the project we're modelling, where your opinin would be highle appreciated. The main HVAC system of our project (small retail building) consists of rooftop units a