ND-v2009 GIBc8:Rainwater managementposted by Noriko Nagazumi on
Hello. Two questions: Are existing constructions required to be part of the project stormwater management? The reference book wording refers to "management plan for the project".
Baseline Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In our project (registered as per LEEDv2009) there are several garage ventilations. According to ASHRAE 62.1-2007, the garage exhaust rate is to be sized to 0.75 cfm/ sq.ft.
Energy Rates for CHP used Project
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener
Project with no off-street parking spaces
ND-Plan-v4 NPDc5:Reduced parking footprintposted by Noriko Nagazumi on
Hi, Our project has no off-street parking spaces.
Modeling Limitations to the Simulation Program
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Vasileios Kalfountzos on
I am currently working on developing the baseline building for our Energy modelling and I'm stuck on the following point of Table G3.1 point 13. "If the simulation program cannot model a component
Controllability of lighting in Shared Area
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Mak on
We are having a hotel project that would like to attempt this credit.
Baseline Hot water pump power for Purchased heat
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project we are modeling follows LEDD v3 - 2007 (System 7) and the heating source is purchased heat. There are two question related to this issue. 1.
Reduced Truck Idling
Warehouses-NC-v4 LTc8:Green vehiclesposted by Michelle Rosenberger on
Okay first up, I'm confused. The Birds Eye Language above is for the regular New Construction options, not for the Warehouses and Distribution options.
Existing Landscape Area
ND-Plan-v4 GIBc4:Outdoor water use reductionposted by Noriko Nagazumi on
Hi, Our project has a portion of existing landscaped area within the project boundary.
Peak building users (FTE + Peak Transients)
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Sara Johansson on
I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that FTE and transients here are average transients?