Forum quick links
Group approach - Minimum requirement compliance
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello everyone!
I am working on 2 buildings that are registered in one project following the group approach.
How to represent product-specific EPDs with LCA tools which don't cover them.
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by on
While we are getting up to speed on using OneClick LCA in our practice, most of our project LCAs are still in Tally, which currently has a more fixed database of materials.
Process consumptions
Warehouses-EBOM-v4.1 EAp3:Energy Performanceposted by RICCARDO BALLESIO on
We are analysing the electrical energy consumption of our client. The building is a warehouse of approximately 10.000 sqm with 1000 sqm of offices.
Ventilation
Warehouses-EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by RICCARDO BALLESIO on
All office spaces are naturally ventilated. The minimum opening location and size requirements are satisfied for all offices, restroom and meeting rooms.
Landscape Exterior lighting LPD Mandatory provisions
NC-v4 EAp2:Minimum energy performanceposted by Julio Fernandez Amodia on
Hi there,
I am currently calculating the power allowance for exterior lighting in a school project.
Theater lighting controls
NC-v4 EQc6:Interior lightingposted by Rafi Karim on
Hi All, we are working on a higher education theater school project where the Theater/Performace spaces do not have lighitng control panel in the same space as the performance because the lights in
Entryway System Documentation - Will Photos Work?
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Marie Miller on
I'm working on a TI project and the client doesn't have access to plans of the main floor. The landlord has said that taking photos will be acceptable, but will photos work for documentation?
Minimum Indoor Air Quality Performance Calculation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Amal Venugopal on
My Project is Having one FAHU on roof which is supplying treated Fresh air to all AHU"s, which further supplying the mixture of outdoor air and Recirculated air to various zone via VAV (no reheatin
Basement lobbies
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marni Punt on
We have a project with 3 lobbies located in basement parking.