Forum quick links
Water Use Reduction
Schools-2009 WEc3:Water use reductionposted by Karly Michalowski on
I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!
Roof for School
Schools-NC-v4 EQc2:Low emitting materialsposted by Josh Inge on
If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?
Joint Compound
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?
VRF System Computation
NC-2009 EAc4:Enhanced refrigerant managementposted by Katherine Mariano on
Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a
Treatment of Outdoor Air for Incomplete Spaces
NC-2009 EAp2:Minimum energy performanceposted by Joseph Chappell on
I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.
Outdoor air delivery monitoring system for evaporative cooler
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Gopinath Vasu on
For projects served by evaporative cooler which is supplying 100% fresh air to conditioned spaces, is it still require to have an outdoor air delivery monitoring system. Even though at minimum flo
Atrium with reception desk
CS-v4 EQc4:Daylightposted by Martin K on
Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.
Over limit adhesive used while building is open
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Jayme Antolik on
I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.
Process water and residential units
NC-v4 WEp2:Indoor water use reductionposted by MAUDE PINTAL on
Our project includes a community center and a multi-residential part.