Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Where did the PIF forms go?

NC-v4 MPR3:Must comply with project size requirements
posted by  Deborah Lucking  on 

Most of the information that used to be required by LEED 2009 for PIFs 1 through 4, are now consolidated into the one single Project Information Form in v4.

1
Thu Feb 2, 2017, 10:21 pm

Hand Hygiene - Towel Dispensers

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Jeannie Rueter  on 

USGBC has a Green Cleaning Policy template in the Resources section of the Credit Library.

1
Fri Jan 20, 2017, 11:31 pm

v2009_Minimum Energy Performance Calculator_v6

NC-2009 EAp2:Minimum Energy Performance
posted by  Alice chen  on 

Hi All, I am working on a project with VRF system for a LEED 2009 certification.

1
Sun Jan 22, 2017, 9:10 pm

Exterior smoking policy

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Andrey Tsvetkov  on 

Dear all, We have a question about exterior non-smoking policy on the project NC.

1
Sat Aug 26, 2017, 8:38 pm

Concerning Signatories

NC-2009 EAc3:Enhanced Commissioning
posted by  Omar Elrawy  on 

I need to know if the two signatories on the EA CREDIT 3: ENHANCED COMMISSIONING - LEEDOnline form are to be signed by the CxA, or by the owner?

1
Mon Jan 30, 2017, 10:55 pm

Soil contaminated (by oil/diesel)

CS-2009 SSc3:Brownfield Redevelopment
posted by  Julia Otero   on 

We are working in a project where a tank containing 6,000 lt of fuel has been detected in the soil.

1
Sat Aug 26, 2017, 11:10 pm

PV System on Campus Project

CS-v4 EAc5:Renewable energy production
posted by  Annalise Reichert  on 

I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.

1
Tue Jan 24, 2017, 3:16 pm

Rainwater reuse

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Michael Smithing  on 

My understanding from the FAQ and response to the "Rainwater used for irrigation" comment is that rainwater reused on site (for sewage conveyance) is considered to meet the credit requirements.

1
Sun Aug 27, 2017, 12:02 am

Multi-family Mid-rise EA Pre-req 1 - Option 2

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Pournamasi Rath  on 

Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%

1
Thu Jan 26, 2017, 8:53 pm

Disincentivizing Low Emitting Products

CI-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

The new bundling of low emitting categories into one credit is resulting in disincentivizing our v4 projects from pursuing low emitting credits they always used to before.

1
Wed Jan 25, 2017, 6:49 pm