Forum quick links
Commingled or Source Separated
NC-2009 MRc2:Construction waste managementposted by Risto Beatty on
Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?
Pilot Credit Closed?
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Angela Wisely on
It appears this pilot credit closed on August 16th. I believe I can still submit it as long as I registered under the pilot credit before that date, correct?
PTAC Monitoring
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Dutchie Grossweiner on
In a mixed use building, the residential dwelling units are being provided outdoor air via PTAC systems (apartment size determines the number of PTAC units).
water cooled chillers
NC-2009 EAp2:Minimum energy performanceposted by sherif el adly on
Hi Marcus, I am working on a project in KSA of about 404330ft2.
Rug
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Alicia Costas Freire on
Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
Chilled water flow and pipe sizes
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Jayakumar Pamuri on
Hi All, I am here to post my query about chilled water system,flow and pipe sizes.
project with courtyard walls...
Pilot-Credits PC14:Walkable Streetsposted by Frank Yao on
We have a small project with a courtyard with an area pretty much doubling the building footprint which has a wall (concrete wall, not a fence) all along the peripheral yard.
SSc2 - Can on-campus uses apply towards "basic services"?
NC-2009 SSc2:Development density and community connectivityposted by Jordan Petersen on
We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.