Multi-Flow Showerhead
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Annalise Reichert on
I am working on a project that plans to install a shower head with three flow options: 0.5 GPM-1.0 GPM -1.5 GPM. How do we account for multi-flow showerheads on the WEp1 form?
Shared underground parking with non LEED certified buildings
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jorge Lopez de Obeso on
Our project, a 200,000 sqft CS office tower (much more to the 20% of the total area) shares 3 levels of underground parking lot with two other buildings (Movie theater, shops, restaurants).
Towers as part of a single building
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
A building is composed by three towers that have the basement, the ground floor, and the first floor in common. The system for the baseline model shall be System 8.
Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Antje Holdefleiss on
Hello Everyone I have the following questions regarding the LEED Project boundary: · Are the project boundary only referring to the ground floor?
Glass Demo
NC-2009 MRc2:Construction Waste Managementposted by Donald Green on
Has anyone had any luck recycling glass taken from a commercial building? They are double pane commercial units removed from the curtainwall system.
WEc1 - We don't really have a "SITE" outside of the building env
Retail-NC-v2009 WEc1:Water efficient landscapingposted by Lou Niles II on
Hello I am working on Two Separate projects that actually overlap on a site; they are not registered as Master Site or Campus and we don't want that at this time. Project A Surrounds Projects B. Pr
Existing Lighting in a TI
CI-2009 EAp2:Minimum Energy Performanceposted by Annalise Reichert on
I am working on a TI retrofit project that did not replace any existing lighting in their space due to budget constraints.
Painting/coating in tenant space
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.
Pursing credit in an existing building
Pilot-Credits EQpc78:Design for active occupantsposted by Dee Spiro on
Our project involves renovating an existing building on a university campus.
Implementing on a university campus
Pilot-Credits PC14:Walkable Streetsposted by Dee Spiro on
When I searched the forum for insight on how to apply/adapt some of the requirements for a campus setting, the posts were from way back in August 2012.