HVAC Equipment Installation prior to Roof
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Maggie Pipek on
The contractor would like to install the HVAC equipment although the roof is not on the building yet.
Construction impact zone for infill
ND-v4 GIBc7:Minimized site disturbanceposted by Colin Day on
Hi Eliot, If a project is an infill, has been previously graded and already contains streets, would it meet the requirements of this credit? Also, if no historic trees existed in this (an old hay
Australian equivalent of fuel-efficient vehicles
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mary Haw on
Our project is based in Australia and is targeting certification under both LEED and the local rating system, Green Star.
Anchor Tenant wants sole access to showers
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by SmithGroup BG+LU FW on
We’ve got a core and shell commercial office building in construction, under 300,000 square feet, using CS-2009.
Mixed species
CS-2009 WEc1:Water Efficient Landscapingposted by Mike D on
Do the different species of plants need to be listed individually on the form or does 'Mixed' suffice? The green roof consists of a mix of trees, shrubs, and flowers. Thanks!
DCV control
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
Can someone help me with exception "b" of mandatory section 6.4.3.9 in 90.1. What is meant by the following: b.
Option 2- Air Testing for amenities
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
We r building a residential tower that has 424 residential units, a swimming pool, a lobby and commercial retail units (CRU).
Core performance path
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jatuwat Varodompun on
We plan to option 1 equipment efficiency. 1 We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".
Natural Ventilation in Baseline?
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
In environments where they will be covered by natural ventilation, how should I proceed in baseline model? For example, a factory or warehouse with the proposed natural ventilation, must be equal
SSc6.2 in urban areas
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by BH . on
Hi, there is a sentence in LEED Reference Guide which makes me really confused (page 103): “For existing sites with greater than 50% imperviousness, structural techniques may include restoring a