Forum quick links
Electric Bike Fleets are ZEV's so...
Healthcare-v2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by John Chinnery on
What are the best ways to maximize the value of a network of ebikes. This ZEV fleet would be checked out for clean trips and returned to storage when done.
Clean Room Protocol and SMACNA standards
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Charlie Popeck on
We are currently working on a LEED project where a significant portion of the finished space will classify as “Clean Room” under ISO 14644-1.
FTE calculations for Mixed Use
NC-2009 PIf3:Occupant and Usage Dataposted by Tarek Saleh on
all, I'm new to the site, but have been browsing most of the comments related to FTE calcs, but I still haven't found what I'm looking for.
Terrazzo Sealer Question
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Todd Bundren on
What is the VOC limit for a Terrazzo Sealer? I'm a bit confused about which category it falls under (Sealer, Floor Coating, or other).
Wood Assembly and Regional Materials
NC-2009 MRc5:Regional Materialsposted by Denice Staaf on
This is a constant question in the wood industry and I am not sure how to answer it.
Natural Ventilation - Brewery Local Distribution Building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Summer Gorder on
I am working on a Brewery Campus expansion that includes a small local distribution building that is utilizing natural ventilation.
ASHRAE Standard 90.1 Table G3.2 and occupancy sensors
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Alex AC on
Hi everybody, My team and I are working on a CI project (office floor) where the tenant has installed occupancy sensors for up to 75% of connected lighting load.
Schools-2009 IDc3: The School as a Teaching Tool
Schools-2009 IDc3:The School as a Teaching Toolposted by Ameet AA on
Could someone please guide me to find credit template/forms for innovation credits?Especially Schools-2009 IDc3: The School as a Teaching Tool As Below link does not give any innovation credits te
Temp Heating
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Andrew Gil on
The Contractor on a project currently under construction has asked a question that I have not yet encountered on the previous (4) LEED-certified projects that I've worked on: He has asked if a "dir
We got comments on our IDc1.1
NC-2009 IDc1:Innovation in Designposted by NA AN on
We got comments on our IDc1.1 credit. The advice is to provide documentation to confirm that a project team representative has registered with LEEDuser and participated in the online forum.