Commissioning near end of construction
NC-v4 EAp1:Fundamental commissioning and verificationposted by Nadia Azzam on
Enhanced Refrigerant Management Query
EBOM-v4 EAc8:Enhanced refrigerant managementposted by padma priya on
We have a VAM Chiller, and we indicated "none" as the refrigerant type because in VAM chillers, water serves as the refrigerant, resulting in zero OWP and GWP.
Lighting Zone for a Terminal Building
NC-v4 SSc6:Light pollution reductionposted by Gustavo De las Heras Izquierdo on
Hello,
100% nonportable water for cooling tower
NC-v4 WEc3:Cooling tower water useposted by Thomas Tran on
Hi,
LEED reference document says in the Required document Table (page 309):
Partial Floor LEED Certification
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified. The project space is approximately 52% - 60% of the total floor
Existing PV on previously certified project
NC-v4 EAc5:Renewable energy productionposted by Yu Zhang on
I have a project that is a new building located on a previous certified LEED project with PV production. The previous project had >90% offset by energy use and >100% offset by cost from
Location Valuation Factor
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Shannon Oletic on
Hello,
LEED Communities - non-contiguous land included
ND-v4 MPR2:Must use reasonable LEED boundariesposted by Lidia Johansen on
Dear All
50% surface area reuse
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Mark Ragucci on
how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'.