Forum quick links
Commissioning of Systems not required in prereq
NC-2009 IDc1:Innovation in designposted by Shauna Sproul on
I am wondering if Innovation & Design Credits can be earned for commissioning systems that are not in the prerequesite, for example the building envelope? I know credits can be earned in 2012 u
Density Lighting Exterior
CS-2009 EAp2:Minimum energy performanceposted by gabriel Morales on
Hi, we have any questions about the desnsity lighting exterior: 1.- The building is located on a corner in one of the main streets of Mexico City, the architectural design has 23 terraces which wil
Exceptional Calculation for Elevator
NC-2009 EAp2:Minimum energy performanceposted by Thomas Hellmann on
My read on ASHRAE-90.1 and numerous forums, is that USGBC may allow for an exceptional calculation to be performed for elevator energy savings, provided that; 1) Schedule of operation remains the s
Only one room non-densely occupied
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Christian Brücher on
Hi, following situation: We have a ventilation system which serves only densely occupied spaces except one small office room for one person which is occupied perhaps 1-2 hours a day (so I would ca
Green Cleaning Plan
CI-2009 IDc1:Innovation in designposted by Elizabeth Powers on
I am working on a project where the building management has in place a green cleaning plan developed for their LEED-EB certification.
Green cleaning products in Mexico?
EBOM-2009 IEQc3.3:Green cleaning - purchase of sustainable cleaning products and materialsposted by Dario Ibarguengoitia on
Hello, I have a couple of projects in Mexico city and I need to know where can I find green cleaning products in Mexico, the only ones that I know and that green seal suggest are from USA, any reco
Reduced / Unreduced VOC Values
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Maya Karkour on
Dear all, I received a material datasheet for anti-corrosive paints. I noticed the following: 1) VOC Unreduced:
Comments received for final design review
CI-2009 IEQp1:Minimum indoor air quality performanceposted by monu goyal on
we had received following comments from GBCI for final design review for IEQP1 credit: Revised documentation has been provided including a response narrative, revised Ventilation Rate Procedure (V
Office shell space
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Orlin Velinov, PE on
We have C&S office building where the majority of the spaces are shell spaces for future office space.
Occupied Spaces
EBOM-2009 IEQc2.4:Daylight and viewsposted by American University on
My question is whether areas like corridors, bathrooms, etc should be included or merely spaces like offices, classrooms, etc where people spend time rather than just passing through.