Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Retail Space inside a Shopping Center

CI-2009 SSc3.3:Alternative transportation - parking availability
posted by  Sustentator Argentina  on 

We are looking to certify a retail space inside a huge shopping center under Commercial Interiors (not as Retail Commercial Interior, the shopping is NOT certified) We are considering that our shop

1
Thu Apr 5, 2012, 2:49 pm

facade lighting savings

CS-2009 EAc1:Optimize energy performance
posted by  Puteri Shireen Jahnkassim  on 

Dear Marcus We conducted an energy simulation analysis and included Facade lighting as one of the energy saving features.

1
Mon Mar 5, 2012, 7:13 pm

Private or Public Restrooms?

CS-2009 WEp1:Water use reduction
posted by  Alejandro Vega  on 

I'm working in a LEED CS Warehouse:non-refrigerant building, the project is divided in 2 main areas: office and warehouse.

1
Mon Mar 5, 2012, 7:50 pm

EAp2 Required Signatories

NC-2009 EAp2:Minimum energy performance
posted by  Bob Korp  on 

Two project engineers have completed the sign-off task, but a 3rd has been unable to use LEED ON-LINE despite my efforts to provide remote assistance.

1
Mon Mar 5, 2012, 10:43 pm

Square Footage Discrepancy

Schools-2009 EAp2:Minimum energy performance
posted by  Michael Kros  on 

Our mechanical engneer/energy modeler just contacted me to ask about a discrepancy in our square footages from what we have entered on PIf2 on LEED Online, and what he has input in the energy model

1
Mon Mar 5, 2012, 11:03 pm

MR3 or MR1.2?

CI-2009 MRc3.1:Materials reuse
posted by  Kenny Grossman  on 

I've got a project where nearly nothing has changed between tenants.

1
Mon Mar 12, 2012, 4:52 pm

How do I find replacement lights?

EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lamps
posted by  Michael Smithing  on 

I've been provided with a light inventory for our building and so know what type of light I'm looking for (e.g. 18W F840). I've also found the Philips, GE and Sylvania LEED-EB calculators.

1
Wed Mar 7, 2012, 7:30 pm

Treatment plant startup

CS-2009 WEc2:Innovative wastewater technologies
posted by  Gabriela Hernández Castillo  on 

Due to the nature of a treatment plant it requires the building to be operating before the treatment plant is functional. Is there any requirement for a maximum of time before the treatment plant

1
Sat Jun 30, 2012, 11:21 pm

EPEAT?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  American University  on 

I see where EPEAT is listed as a resource in the LEED guide but where in the guidance does it say that EPEAT-rated electronics comply with the sustainable purchasing criteria?

1
Wed Mar 7, 2012, 2:34 pm

IEQ Innovation Credit

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Martin Dettling  on 

Is it safe to say that if a project acjhieves 60% improvement over ASHRAE 62.1 outdoor air ventilation rate that the project would be likely to receive an innovation credit if applied for?

1
Fri Mar 16, 2012, 4:47 pm