Industrial Process Loads and the Exceptional Calulation Method
NC-2009 EAc1:Optimize Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use.
Modeling only conditioned area
NC-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?
Irrigation Establishment Period Flexibility / Regional Adjustments
NC-v4 WEp1:Outdoor water use reductionposted by Pooja Sannamani on
For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-year
Walk off mats for skyway entrance
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by SIG - Sustainability Main Account on
Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "regularly used exterior entrance", thus require a walk off mat?
Storage location
NC-v4 MRp1:Storage and collection of recyclablesposted by Maiz Rech on
Is there a minimum distance or positioning requirement for this area?
Would it be a problem to locate the recyclables storage on the building underground floor?
Buildings within site but not under LEED scope
NC-v4 EQp2:Environmental tobacco smoke controlposted by Marwa Elzoghby on
I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope.
Gross Floor Area
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage. Since gross floor area also includes the exterior wall
Exterior Illuminated Signage
EBOM-v4 MRc2:Purchasing - lampsposted by Kristina K on
Hello,
Does this credit apply to Exterior Illuminated Signage?
Thank you
Multi-building project - installing renewables on only 1 building
CS-v4 EAc5:Renewable energy productionposted by Shannon Oletic on
We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach).
PC MRpc87 Feedback
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Dan Ackerstein on
Feedback from the architecture firm and general contractors re: PC implementation in Southern California