Forum quick links
Pilot Credit – Local Food Production
EBOM-v4 INc1:Innovationposted by Amanda Tullos on
We are trying to pursue Pilot Credit – Local Food Production, but we are not sure how the Site-specific IPM record log, including a narrative describing universal advance notification of
Innovation: WELL Features
NC-v4 INc1:Innovationposted by Laura Heagler on
This innovation credit awards a point for complying with WELL Feature 87: Beauty and Design.
Density Calculation
NC-v4 LTc4:Surrounding density and diverse usesposted by Ahmed Abdul Rahman on
Hello All,
I am new to LEED certification and will be going through my first certification process soon.
Entryway Systems
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Lara Ibarra on
Hi everyone,
Modeling a backup District energy source
CS-2009 EAp2:Minimum energy performanceposted by Florian Pingaud on
Dear All, I am requesting help on the energy modeling protocol for a building both connected to a stand-alone plant and a district energy system. I read a lot of posts on the forum before posting
Products applied offsite and non-Occupied spaces
NC-v4.1 EQc2:Low-Emitting Materialsposted by elias eid on
Hi all;
I would ask if the products applied offsite such as(paint for steel structural sections, Aluminum profiles, Wooden doors,...)
IAQ REPORTS
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Nagaraj Sankar on
IAQ test report
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Nagaraj Sankar on
Native plants = No Irrigation Required?
NC-v4 WEc1:Outdoor water use reductionposted by Yoyo Shek on
Hi All,
Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that:
Calculations or descriptions
NC-2009 EAc5:Measurement and verificationposted by Barbara Aguirre Garcia on
For credit, is it necessary to make calculations within the plan, regarding the baseline calculation, the reporting period? Or is it just describing the elements to do the calculations?