Submetering requeriments for exclusive chiller for tenant space

CI-2009 EAc3:Measurement and Verification
posted by  Maria Isabel Conde  on 

The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area.

1
Fri Dec 15, 2017, 3:21 pm

Case 2: Meter base building/ Submetering tenant space

CI-2009 EAc3:Measurement and Verification
posted by  Susan M. Kaplan  on 

This might be a redundant question; I'm sorry if it is. We fall into the Case 2 category as we're more than 75% of the building.

1
Fri Apr 22, 2011, 11:03 pm
1
Tue Oct 18, 2011, 3:44 pm

Emergency generator fule meter

CI-2009 EAc3:Measurement and Verification
posted by  Edwin Wealend  on 

Hi we have a LEED CI project that is served by an emergency back-up generator that serves multiple floors. Is it really a requirement to meter emergency back-up generator fuel?

1
Tue Jun 2, 2015, 2:06 pm

Tenant Sub-Metering

CI-2009 EAc3:Measurement and Verification
posted by  Donald Green  on 

Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.

1
Thu May 12, 2016, 2:41 am
1
Tue Jan 11, 2011, 11:24 pm

Tenant Submetering

CI-2009 EAc3:Measurement and Verification
posted by  sompoche sirichote  on 

I have read the previous threads but still not sure about the tenant submetering. The Table 2 in LEED CI guideline indicates that no submeter is required for the cooling if it is included in prora

1
Tue May 28, 2013, 2:34 pm

initial cost for lease

CI-2009 EAc3:Measurement and Verification
posted by  Monica Hue  on 

Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?