I have a store (case 1) with a small 60 ton chiller, 2 AHU's, lighting, and plug loads. If HVAC, plug loads, and lighting can be measured on one meter, how many meters do I need? Does the chiller fall under HVAC in this case?

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 11/26/2012 - 16:45

The chiller is an HVAC load and can be metered with the remainder of the HVAC systems, lighting, and plug loads.