Submetering requeriments for exclusive chiller for tenant space

CI-2009 EAc3:Measurement and Verification
posted by  Maria Isabel Conde  on 

The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area.

1
Fri Dec 15, 2017, 3:21 pm

Spot Metering for CI 2009 EAc3 Option B

CI-2009 EAc3:Measurement and Verification
posted by  Michael Hill  on 

I am working on a project which is considering pursuing CI 2009 EAc3 Option B. I am wondering if continuous metering is required for this path or if spot metering would be acceptable.

1
Mon Apr 7, 2014, 1:15 pm

Alternative Compliance Path Case 1: Lease Document

CI-2009 EAc3:Measurement and Verification
posted by  Carolina Acevedo  on 

Is there an alternative compliance approach to this credit? My project falls under Case 1 (less than 75% of the project space), but my client owns the floors hence the lack of a lease agreement.

1
Tue Jan 15, 2013, 6:52 pm

Submetering dashboard

CI-2009 EAc3:Measurement and Verification
posted by  Leticia SooHoo  on 

Hello, we are doing a LEED CI project for a large tenant occupying multiple floors. We will pursue Case 1 (less than 75% of area) - submetering.

0

LEED-CI EAc3

CI-2009 EAc3:Measurement and Verification
posted by  Tapio Peltonen  on 

LEED-CI 2009 EAc3 Case 1 Online form has options for sub-metering or central plant. Does the central plant mean that the tenant space is served by e.g.

1
Thu May 26, 2011, 11:00 pm

submetering equipment

CI-2009 EAc3:Measurement and Verification
posted by  Yaser Al Sharif  on 

our Project is LEED CI v3 at credit EA c3, what is process uses ( electric) and process uses (fuel) ?????? another question , at our tenant space we have boiler fuel operated to supply under floor

1
Wed Apr 2, 2014, 2:35 pm

Case 2: Meter base building/ Submetering tenant space

CI-2009 EAc3:Measurement and Verification
posted by  Susan M. Kaplan  on 

This might be a redundant question; I'm sorry if it is. We fall into the Case 2 category as we're more than 75% of the building.

1
Fri Apr 22, 2011, 11:03 pm

Emergency generator fule meter

CI-2009 EAc3:Measurement and Verification
posted by  Edwin Wealend  on 

Hi we have a LEED CI project that is served by an emergency back-up generator that serves multiple floors. Is it really a requirement to meter emergency back-up generator fuel?

1
Tue Jun 2, 2015, 2:06 pm
1
Tue Oct 18, 2011, 3:44 pm

Tenant Sub-Metering

CI-2009 EAc3:Measurement and Verification
posted by  Donald Green  on 

Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.