Forum quick links
Submetering requeriments for exclusive chiller for tenant space
CI-2009 EAc3:Measurement and Verificationposted by Maria Isabel Conde on
The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area.
Spot Metering for CI 2009 EAc3 Option B
CI-2009 EAc3:Measurement and Verificationposted by Michael Hill on
I am working on a project which is considering pursuing CI 2009 EAc3 Option B. I am wondering if continuous metering is required for this path or if spot metering would be acceptable.
Alternative Compliance Path Case 1: Lease Document
CI-2009 EAc3:Measurement and Verificationposted by Carolina Acevedo on
Is there an alternative compliance approach to this credit? My project falls under Case 1 (less than 75% of the project space), but my client owns the floors hence the lack of a lease agreement.
Submetering dashboard
CI-2009 EAc3:Measurement and Verificationposted by Leticia SooHoo on
Hello, we are doing a LEED CI project for a large tenant occupying multiple floors. We will pursue Case 1 (less than 75% of area) - submetering.
LEED-CI EAc3
CI-2009 EAc3:Measurement and Verificationposted by Tapio Peltonen on
LEED-CI 2009 EAc3 Case 1 Online form has options for sub-metering or central plant. Does the central plant mean that the tenant space is served by e.g.
submetering equipment
CI-2009 EAc3:Measurement and Verificationposted by Yaser Al Sharif on
our Project is LEED CI v3 at credit EA c3, what is process uses ( electric) and process uses (fuel) ?????? another question , at our tenant space we have boiler fuel operated to supply under floor
Case 2: Meter base building/ Submetering tenant space
CI-2009 EAc3:Measurement and Verificationposted by Susan M. Kaplan on
This might be a redundant question; I'm sorry if it is. We fall into the Case 2 category as we're more than 75% of the building.
Emergency generator fule meter
CI-2009 EAc3:Measurement and Verificationposted by Edwin Wealend on
Hi we have a LEED CI project that is served by an emergency back-up generator that serves multiple floors. Is it really a requirement to meter emergency back-up generator fuel?
Are Form submetering requirements greater than Ref Guide?
CI-2009 EAc3:Measurement and Verificationposted by Raphael Sperry on
In Case 1 (project
Tenant Sub-Metering
CI-2009 EAc3:Measurement and Verificationposted by Donald Green on
Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.