LEED Retail CI EAc1.3 zoning and controls
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Francisco Aguirre on
Hi, I am working on a retail project with a VAV system where zoning is performed by variable dampers controlled by thermal sensors in each different thermal zone.
EER requirement and VFD air cooled equipment - Help
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Tiombe Parrish on
We have a proposed LEED Silver office building under LEED 2009 for Commercial Interiors.
Complete information on Variable Speed Control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mike D on
There are no pumps or VAV fans on this project which are 5hp or greater.
LEED CI - HVAC Syatem selection and Fan power Modeling
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SAMY Chamy on
Dear All:- How to select the Baseline HVAC system for LEED CI Project and how I calculate the fan power for fan interlocked with HVAC system Can we us the 7Group fan power calculator for baseline
3 questions
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mark Taake on
Our project involves multiple renovations of areas within a large hospital. We are applying under CI rather than Healthcare because the project is not a total gut.
Percent Annual HVAC Energy Cost Reduction
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Which Cost reduction equation should be used on template when cooling plant has been updated with a high efficiency chiller and therefore proposed has been modeled including all the areas that th
Project Scope and Tenant Scope
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Leandro Silva on
Another one I can´t quite get my head around. Our client will be the sole tenant in a small commercial building.
Baseline System parameters with a DES
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Luke Knapp on
I'm designing a building on a college campus that has a DES. We opted to model option 1 for EAc1 (Building Stand-alone scenario).