Base build pumps and fans

Hello, If all central pumps and fans are base build, does section 3.10 of the form need to be completed? Also, does the 'Total tenant space fan and pump sizing' under section 1.4 have to be filled or can that be left blank? Thanks!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 03/04/2014 - 23:59

Check LEED Interpretation, #10135 & #10134. If the equipment is the primary means of serving the space it needs to be included.