Forum quick links
Entering "total project space equipment capacity" - LEED form
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Seema Pandya on
In the LEED Online form for option 1 section 1.4: Mechanical System Design Criteria, there is a place for you to enter the total space loads for heating and cooling and another entry that asks for
accounting for equipment not listed in CPG tables
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Keith Amann on
The Core Performance Guide, and it's reference standard (Consortium for Energy Efficiency Commercial Unitary AC and HP Specification) has no standard for large (760 kbtu/h) systems.
Partial Load Calculations & Fan Sizing
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Nick Chiarelli on
Hello, This project is 12 floors served by base building AHU's, pumps, chillers, etc.
Core Performance Compliance New Air-handler- Existing Chiller
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Tom Nichols on
If we specify a new air handler that uses steam and chilled water from existing systems, do these systems need to comply with the CPG efficiency requirements?
Conflicting Requirements in Interpretations re: Active Controls?
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Theresa Schroeder on
I am working on a multi-story office fitout for a single tenant, and we received a review comment on our submission regarding EAc1.3 asking us to "provide documentation that all conference rooms ha
Detailed Plant Simulation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Chilufya Lombe on
Hi, we have a project with a certain number of 'back up' systems for air conditioning.
active control for private offices
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mark Taake on
I'm beginning to think that in many cases the private office active control requirement can be made to work for a VAV system only if each office has a separate motorized damper in the supply duct s
Energy modeling
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Muzammal Abbas on
Dear Sir, I want to know that is it mandatory to provide energy modeling for commercial interior project's for LEED submission, Now my second question is that i am using a HAP 4.8 and eQUEST softwa
Datacentre Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.