EAp2 Equipment Motors

CI-2009 EAp2:Minimum Energy Performance
posted by  Eric Claycamp  on 

For a LEED CI project that includes a fitness center, do you count the motors in the treadmills and cross trainers? No fitness equipment I have found is Energy Star rated.

1
Wed Mar 23, 2011, 9:09 pm

CI Project retail Store - EA PR2, ASHARAE 90.1, Section 9.4.1.2

CI-2009 EAp2:Minimum Energy Performance
posted by  Sustentator Argentina  on 

Hi, I have a question regarding the Space Controls. The controls installed, control the spaces remotely and they are located inside the electric panel.

1
Thu Apr 19, 2012, 6:35 pm

Energy star

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

Energy star I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to

1
Wed Jun 17, 2015, 7:53 pm

video conferencing equipment

CI-2009 EAp2:Minimum Energy Performance
posted by  Kristen Magnuson  on 

Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.

1
Sun Mar 20, 2016, 11:56 pm
1
Wed Jun 30, 2010, 2:39 pm

ASHRAE 90.1- Mandatory Provision 10.4

CI-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sobral  on 

If EPAct 1992 does not reference 50Hz electrical motors, these don't need to comply with 10.4 minimum efficiencies? Thanks in advance.

1
Fri Dec 2, 2011, 4:09 pm

EAp2 Energy Equipment form

CI-2009 EAp2:Minimum Energy Performance
posted by  Steve Zuwala  on 

When listing non-energy star equipment we enter N/A in the Make or model column.

0
1
Thu Jan 6, 2011, 3:41 pm

Demand control ventilation requirement

CI-2009 EAp2:Minimum Energy Performance
posted by  Gustav Alfaro  on 

Hi to all: In our project we have a cafeteria (2,000ft2) with the following features: 1. a density of 55 people per 1,000ft2 2. The outdoor airflow (3,600 cfm) is being delivered by an DOAS 3.

1
Thu Feb 19, 2015, 3:42 pm

Existing Building Envelope does NOT Meet ASHRAE 90.1-2007

CI-2009 EAp2:Minimum Energy Performance
posted by  James Keohane  on 

How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures?

1
Tue Jan 26, 2016, 11:02 pm