Forum quick links
Toilet Scope
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by sompoche sirichote on
If our client who own the entire building would like to do the fitout for only 1 floor.
Projects in Europe may use the values defined by EU standards?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Michael Smithing on
Does anyone have any idea what these standards are or where they can be found? The European water label gives its highest rating (Green) to WC taps with a flow of 6 liter/minute or less.
WEp1 compliance
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Roberto Meza on
Hello, I have a project in which the only fixture inside the project scope is a small kitchen sink, of course that it will be water efficient. Shall I fill the LEED Online form with only this in
CI Toilets for employees vs customers
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Sustentator Argentina on
We are pursuing CI for a retail space inside a huge mall.
Existing Fixtures in the Tenant's Space
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Matthew Catterall on
We have a project that is a renovation to part of a tenant's existing space.
Core area added to boundary?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Graham Langton on
"When a project has replaced some of the core fixtures, they have essentially brought those fixtures into their LEED-CI project scope of work." A project in which fixtures are replaced in the core
Credit Template Troubles
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Glen LeComte on
I am filling out the pre-requisite template for our LEED 2009 CI project. There are only 2 Break Room Sinks for the project.
Low Flow Sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Ray Jones on
All, Is a break room sink in an office space considered a kitchen sink with a 2.2 gal/min baseline or a commercial lav with a .5 gal/min baseline?
Laboratories
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jennifer Berthelot-Jelovic on
Is it safe to assume that faucets that are installed in labs are not included in the water fixture calculations since they are not listed in the reference guide?