Forum quick links
CO2 sensors located in the return duct
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Katie Raymond on
I noticed Ben's comment below from February 10th, "Also, if the CO2 sensors are located in the return duct, the review team will likely request justification for how those sensors are accurately a
Ez for projects unable to meet ASHARE 62.1-2007?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Hello. Is it necessary to consider the zone air distribution effectiveness (Ez) for projects unable to meet ASHARE 62.1-2007 when calculating 10cfm/person minimum ventilation? Thanks in advance,
Pz - Zone Population real vs default occupant density
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Hello. On 6.2.2.1 Breathing Zone Outdoor Airflow, I read "Note: If Pz cannot be accurately predicted during design, it shall be an estimated value based on the zone floor area and the default occu
EZ
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Cheryl Burkinshaw on
I am working on a small project with a design team that is fairly new to LEED.
IEQp1 Design Supply Air Question
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by AshLee Eustace on
Hi, For the Design total supply to zone (Vdzd) and Design total supply airflow (Vpsd), should those numbers reflect the design flow at the condition analyzed?
Using the 62MZ calculator
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Christina Reeves on
Hello, I have two questions from our ME about using the spreadsheet calculator: 1. Neither of us can get the macros to work on the calculator - to add zones, etc.
Exhaust Systems Report
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Richard Navarro on
Hi all, We received our comments back from the reviewers and it appears we are missing our exhaust systems report.
Total Peak occupancy filled in Plf 3 AND the one used in IEQ P1
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Tam Kin Hung on
I am working on a LEED EB project, the Total Peak occupancy filled in Plf 3 is clear, however, but just wonder how this number can also maintain reasonable in IEQ P1 in order to calculate the Popul
Ventilation By Exhaust air make-up
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Chinthaka Jagodaarachchi on
We working on a industrial building where there is an unconditioned dining area for factory workers. This dining area is provided with roof mounted exhaust fans.
Performance Period Question
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Nelina Loiselle on
On this same note, what do you all think about this situation: we have all our OA measurement done for each AHU and all are complying except 1 because the TAB contractor thought it was acceptable t