Post a question or comment
Credit Filters
Minimum IAQ Performance
Filter by location
Forum
Topic
Replies
Recent
1
Fri Nov 12, 2010, 11:12 am

Unable to Meet Pre-req during Current Performance Period

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Kristofer Kiszynski  on 

I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?

1
Tue Oct 11, 2011, 4:49 pm

Case 2

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  AAME User  on 

If the 62MZ calculator reveals that the critical zone is a zone with cooling only (with a min of 0), is that an appropriate reason to pursue Case 2?

1
Wed Oct 3, 2012, 3:40 pm

Which calculator version I have to use

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Patricia Fuertes  on 

I have downloaded the "USGBC LEED 62MZCalc (May 2011) and I have to complete manually the cells that correspondon to the "Inputs of the system".

1
Tue Apr 16, 2013, 2:45 pm

Exhaust Fans in Production area

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Janna Nash  on 

For LEED EBOM 2009, IEQp1, are exhaust fan test reports required for every fan or just one per type.

1
Mon Aug 11, 2014, 5:42 pm

mutiple or single zones

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Richard Land  on 

Hi All At risk of looking foolish has anyone succesfully presented an AHU serving a single zone when all those zones are identical?

1
Wed Mar 8, 2017, 11:18 pm

Parking and Data center included?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Ricardo Sobral  on 

Our project includes one Data Center and a parking space.

1
Thu Feb 24, 2011, 1:41 am

Mixed use: Production; Shipping/Receiving; R/D; Office Space

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Aaron Nelson  on 

The building has four space types and 20 AHUs. The building lacks any integrated controls, so each AHU operates independent of the other.

1
Tue Dec 11, 2012, 6:47 pm

Fresh air from different AHUs for the same room

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Shadi Sobh  on 

hi all, An existing case were the floor is feed by two (2) variable AHU’s, and a specific room is supplied via two (2) VAVs and each VAV is connected to a different AHU; while calculating the fre

1
Wed Jul 10, 2013, 2:25 pm

Fresh Air Measurements on Rooftop Units

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Christopher Pinkowski  on 

I am applying this credit to ten rooftop units that lack a straight duct section long enough to traverse with a pitot tube.

0