In our building we have two main AHU that supply 26 AHU (one for each floor of the building) and then we have VAVs for each zone in each floor.

Do I need to perform measurements just in the two main AHU since this are the ones that have fresh air intake or we need to perform measurements in both the main and secondary AHU?

Thank you in advance