Type and sub-type area matrix IEQ EBOM

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Hector Miranda  on 

I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?

1
Fri Dec 20, 2013, 5:55 pm

Can ebom 2009 use IEQp1 v3 forms?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  James Doyle  on 

Our EBOM 2009 project (registered in late 2011 or early 2012) Score Card indicates that for IEQp1 we are to use the v4 form.

0

IEQ p1 options

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Ramon Gomez  on 

Hi, we are filling the form for the IEQp1 and we have a doubt on what to choose between mechanically ventilated or mechanically conditioned, since we consider our areas mech.

1
Wed Jan 9, 2013, 5:46 pm

VAV minimum for Ds

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  George Kotsis  on 

Hello all, I am completing the 62mzcalc spreadsheet during heating mode. VAV box minimums are typically 30% for systems with reheat.

1
Thu Feb 13, 2014, 6:11 pm

EBOM Project Occupancy Doubt

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi everyone, I’m working on a project and I have a doubt about occupancy in the EBOM. After the measurements, we found that the air conditioning system does not meet the external ventilation lev

1
Mon Dec 8, 2014, 2:56 pm

Formaldehyde

posted by  Scott Siegel  on 
1
Mon Nov 16, 2009, 12:43 am

Exhaust System test for pressurized buildings with no exhaust

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Alice Cook  on 

Hi all, We have an existing building built in the early 1900s with three 100% make up air units supplying fresh air with no exhaust.

1
Tue Jun 19, 2012, 3:02 pm

How to justify Er variables

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Tam Kin Hung  on 

The project is using VAV system and the total supply to each zone (Vdzd) accounts for both primary air and local recirculated air.

1
Thu Nov 7, 2013, 9:46 pm

VRP calculations for fan-powered boxes using 62MZ calc

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  tiantian zhou  on 

Our system has fan-powered VAV boxes. The first review comments required us to use 62MZ calc to account for local recirculation. But we have 120 AHUs and hundreds of zones.

1
Fri Apr 11, 2014, 7:57 pm

10% exemption?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Alice Cook  on 

I'm unclear if 10% of space can be exempted for this prerequisite. Could someone clarify this? We have a project where we have several retail spaces on the ground floor of an office high rise.

1
Tue Feb 8, 2011, 1:37 pm