62MZ calulator spreadsheet with critical zones

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Sofia Otterheim  on 

Hello everyone maybe our first question posted here earlier was not so clear. we just want to know how many critical zones should be put into the spreadsheet with each AHU unit ??

3
Mon Nov 26, 2012, 5:03 pm

Critcal Zone 100% Out Door Air System

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Natascha Altensen  on 

We are currently confusion regarding a review we received. Our building is a multizone building that is supplied with 100% outdoor air.

3
Mon Nov 26, 2012, 5:01 pm

Clarifying this preReq - small project

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Janna Nash  on 

I am working on my first LEED EB project and I am not sure how to meet this pre-requisite. BACKGROUND: My project is a small office building (2000 sq.

6
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Tue Oct 30, 2012, 8:36 pm

Zone population

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Billy Nguyen  on 

Hi all, I was doing the calculation for my office, and this confused me about the zone population because my office has 2 zones, office zone and conference rooms.

3
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Jun 19, 2012, 3:18 pm

Lg AHU serving multiple floors, perform calcs at zone level?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  AAME User  on 

I was brought on to a project to complete the ASHRAE 62.1 calculator after the project was denied LEED EBOM IEQp1. The project consists of two high rise office buildings.

4
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Thu Mar 29, 2012, 4:19 pm

Related to 62Mz Calc

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Dorilee Torres  on 

On the requirements of this prerequisite it says " Each air-handler must be measured; sampling or grouping of air-handlers is prohibited"; If I have three AHU's working for the same zone how can I

3
Wed Feb 22, 2012, 4:51 pm

IEQp1 compliance for high-rise with 1 outdoor air intake

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Dawn Brenner  on 

The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007.

3
Default Avatar
Director of Engineering & Sustainability
Qualis Group LLC
LEEDuser Basic Member
15 thumbs up
Fri Dec 2, 2011, 3:08 pm

Vacancy - EQp1 Calculations

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Alice Cook  on 

We have a floor that is vacant in our project building.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 2, 2011, 1:23 pm

Measure AHUs or measure air flow in each room?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Michelle Perez  on 

Hello, We are currently working on a LEED EBOM project at our University campus.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Fri Dec 2, 2011, 1:10 pm

System status report for ventilation system

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Sundararaj Subburaman  on 

We are pursuing LEED-EB:O&M for an office building. It has BAS functions for heating, ventilating, and air conditioning system.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Tue Oct 18, 2011, 5:54 pm