Hello everyone maybe our first question posted here earlier was not so clear. we just want to know how many critical zones should be put into the spreadsheet with each AHU unit ??
Critcal Zone 100% Out Door Air System
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Natascha Altensen on
We are currently confusion regarding a review we received. Our building is a multizone building that is supplied with 100% outdoor air.
Clarifying this preReq - small project
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Janna Nash on
I am working on my first LEED EB project and I am not sure how to meet this pre-requisite. BACKGROUND: My project is a small office building (2000 sq.
Zone population
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Billy Nguyen on
Hi all, I was doing the calculation for my office, and this confused me about the zone population because my office has 2 zones, office zone and conference rooms.
Lg AHU serving multiple floors, perform calcs at zone level?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by AAME User on
I was brought on to a project to complete the ASHRAE 62.1 calculator after the project was denied LEED EBOM IEQp1. The project consists of two high rise office buildings.
Related to 62Mz Calc
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dorilee Torres on
On the requirements of this prerequisite it says " Each air-handler must be measured; sampling or grouping of air-handlers is prohibited"; If I have three AHU's working for the same zone how can I
IEQp1 compliance for high-rise with 1 outdoor air intake
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dawn Brenner on
The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007.
Vacancy - EQp1 Calculations
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alice Cook on
We have a floor that is vacant in our project building.
Measure AHUs or measure air flow in each room?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Michelle Perez on
Hello, We are currently working on a LEED EBOM project at our University campus.
System status report for ventilation system
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Sundararaj Subburaman on
We are pursuing LEED-EB:O&M for an office building. It has BAS functions for heating, ventilating, and air conditioning system.