Forum quick links
Portfolio Manager for Dormitories
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by JOHN COOK on
We have an 180,000 sf dormitory and trying to get an ENERGY STAR rating through Portfolio Manager.
Office Space With 25% Data Center Changing to 100% Office-June
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Michelle Bracewell-Musson on
There are four buildings that are leased by the State and one of the buildings currently has 25% if it as a Data Center.
Increased energy consumption by a single tenant
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Anna Korinkova on
Hi all! How to correctly input energy data (to ES Portfolio Manager) for an office building where a tenant (bank) has it's own chiller, consumes almost one third of the total building energy consum
EAP2 Minimum Energy Performance -- How to classify building
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by cathy keagle on
We have a client that would like to attempt to certify one building that is part of a college campus. This building is primarily instructional classrooms, some office space, and an auditorium.
Energy Star Portfolio Manager
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Pablo Fortunato Suarez on
I had recently checked the Energy Star Portfolio Manager website and it seems to be down. It has been a few days.
Use energy per unit per year to compare?- how to normalize? Case
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by stephen sinkovich on
Case 2 Option 2 -We are doing a LEED feasibility study for an existing 40+ year old automotive engine Plant that is being refurbished and upgraded with new process equipment.
LEED EBOM EAP2 Minimum Energy Effiuciency
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by ABDUL MUTHALIB MOHAMED on
Hi, We are pursuing Option 2B: Energy Baseline including Historical Data for minimum energy efficiency, the weather normalized Energy Use Index from Energy Star Portfolio Manager during performance
Using historic data
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Omar Delgado on
What are the requirements to comply with this prerequisite if using historic data? How much (percentage) lower than the historic average must my current EUI be?
Labs21
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Gustavo De las Heras Izquierdo on
Hallo, We are certifying a LEED EBOM project composed of 28% laboratory and 72% office. The Case 2, Option 1 Labs is asking to enter to parameters: i.This Project Building's annual weather nor