Post a question or comment
Credit Filters
Thermal Comfort—Verification
Filter by location
Forum
Topic
Replies
Recent

Custodial Staff Thermal Comfort

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Jeannie Rueter  on 

My question is regarding a conference center. How do you handle surveying custodial staff that don't have offices? Would they report on the thermal comfort of the break room?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jan 18, 2017, 5:39 pm

survey after 18 mos.

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  PATRICK HILLIER  on 

So we are scraping for a few more points that we lost in our CD review. It is now 18+ mos. after occupancy - can this credit still be obtained?

2
Thu Jun 23, 2016, 3:49 pm

IEQc7.2

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Alex Brown  on 

Where can I get a sample Thermal Environment Survey Form to upload to satisfy the LEED Reviewer?

3
Default Avatar
Sr Project engineer
SJ Engineers
LEEDuser Basic Member
1 thumbs up
Mon Jun 6, 2016, 8:24 pm

Thermal Comfort Survey

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Leed User  on 

I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and

5
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
27 thumbs up
Thu May 21, 2015, 10:08 pm

How long do you have to do surveys?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Parker williams  on 

How long do you have to do surveys? Is this suppose to be ongoing forever?

4
Default Avatar
Energy Engineer
7group
LEEDuser Basic Member
18 thumbs up
Wed May 20, 2015, 9:45 pm

The missing point

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Cesar Ruiz  on 

Greetings, I am developing a exclusively residential project, and thus I realize that this credit is not applicable for my project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Oct 22, 2014, 7:50 pm

Dormitory / Mixed Use Project

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Cassandra Coffin  on 

I am working on a new residence hall for a University in which the lower two floors consist of offices, a large multi-purpose room, a seminar room, a learning commons center, a cafe and custodial/m

3
Fri Mar 28, 2014, 4:46 pm

LEED Exam question

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Farah A.  on 

All of the following are true of IEQ Credit 7.2- Thermal Comfort- Verification except: A. The credit requires surveying building occupants B.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Feb 25, 2014, 8:44 pm

Periodic testing

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Albert Sagrera  on 

What time interval should be between each measuring on air speed and radiant temperature?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 24, 2014, 3:06 pm

Signatories

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  William Weaver  on 

I've noticed a subtle change with the most current templates. Particularly, the signatory for this credit no longer specifies who must sign the template.

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Aug 20, 2013, 9:45 pm