NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Scott Davis on
I am trying to achieve this credit for an apartment building. On the LEED v2009 form the residential units were selected as 'Individual' to match the IEQc6.1 form.
BMS as Thermal Comfort Contol
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Kristen Gomez on
Has anyone pursued this credit using BMS as thermal comfort control?
Averaging Thermostats - acceptable means for 50%?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mark Van on
I am working on a Healthcare building, and most of the spaces combine (3) rooms into a single temperature control zone, with the thermostat located in one of the rooms. Would adding (at least
underfloor system supplying minimum outside air with radiant panel
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by X. Chen on
Hi, we are designing a project that has a DOAS unit serving code min outside air through underfloor plenum to the space with ceiling radiant panels handling heating and cooling load.
Thermal Contrillability: No of thermostat points and alternative
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Yong Lee Low on
We have a total of 2385 individual spaces and to provide thermostats for 50% of these is required to score a point. which means is it that we are required to provide 1193 numbers of thermostats?
Mixed strategy, windows and mechanical ventilation?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Lise Dannesboe on
If I understand the intent of the credit correctly, we have to provide individual controls for every second FTE in individual spaces or open-plan offices.
Location of underfloor air diffusers
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saurabh Shrestha on
Hi, We have a project that has a large number of individual work stations and we are trying to achieve this credit by providing underfloor air diffusers for each work station.
Uploading Documentation
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Hi all, When submitting documentation for this credit, through LEED Online, are we supposed to upload all the plans showing the thermal controls or can we just upload some of them (i.e.
Multi-occupant rooms: Are operable windows compliant?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Larry Jones on
It seems a little unclear, but can operable windows be used for multi-occupant spaces to comply with EQc6.2?
1 VAV 2 offices, one restroom
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
Hello. I have a question regarding the controllability of thermal comfort for 2 offices.